[{"id":29822,"date":"2025-11-06T16:00:32","date_gmt":"2025-11-06T15:00:32","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/investition-in-digitale-zukunft\/"},"modified":"2026-03-18T15:17:23","modified_gmt":"2026-03-18T14:17:23","slug":"investition-in-digitale-zukunft","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/investition-in-digitale-zukunft\/","title":{"rendered":"Investment in the digital future: HABAU relies on data centre from EPS Electric Power Systems"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29822\" class=\"elementor elementor-29822 elementor-29782\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fd5a18a e-flex e-con-boxed e-con e-parent\" data-id=\"fd5a18a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-93d95e5 e-con-full e-flex e-con e-child\" data-id=\"93d95e5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-662f13e elementor-widget elementor-widget-text-editor\" data-id=\"662f13e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>A future-proof data center for a leading construction company<\/h2><p>The HABAU GROUP has invested in the modernization of its IT infrastructure \u2013 with a high-availability <a href=\"https:\/\/www.eps-dc.com\/en\/serverraum-planung-beratung-errichtung\/\">data center<\/a>, planned and implemented by EPS Electric Power Systems. The owner-managed family business with around 6,500 employees has been operating internationally for more than a century and is now one of the leading players in the Austrian construction industry. Whether it&#8217;s building construction, civil engineering, tunnel construction or pipeline construction, the HABAU GROUP is broadly positioned \u2013 and therefore also needs an IT infrastructure that can keep pace with this complexity.  <\/p><h3>From old stock to high-end solution<\/h3><p>The existing server room at the Perg site dates back to 2005 and no longer met today&#8217;s requirements for reliability, redundancy and energy efficiency. Since large parts of the Group-wide IT services are operated via this room \u2013 together with a second, external data center \u2013 modernization was urgently needed. <\/p><p>&#8220;When we visited the new EPS data center at the subsidiary \u00d6STU-STETTIN, it quickly became clear to us that this solution was convincing,&#8221; recalls Gerald Froschauer, Head of the IT Department at HABAU.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3a28f3a e-con-full e-flex e-con e-child\" data-id=\"3a28f3a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ddc2cbb elementor-widget elementor-widget-testimonial\" data-id=\"ddc2cbb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"The cooperation with HABAU was characterized by trust and professionalism.\"<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\"><img fetchpriority=\"high\" decoding=\"async\" alt=\"Peter Reisinger, neuer Geschaeftsfuehrer von EPS\" width=\"2200\" height=\"1467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265.jpg\" class=\"attachment-full size-full wp-image-24574\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265.jpg 2200w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1080x720.jpg 1080w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-300x200.jpg 300w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-768x512.jpg 768w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1536x1024.jpg 1536w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-2048x1366.jpg 2048w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-600x400.jpg 600w\" sizes=\"(max-width: 2200px) 100vw, 2200px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Peter Reisinger<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Managing Director of EPS<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d4ffbdc e-flex e-con-boxed e-con e-parent\" data-id=\"d4ffbdc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f4ba2f6 elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"f4ba2f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_Gruppenfoto-1-1080x720.jpg\" alt=\"Paul Muehlb\u00e4chler, IT Services at HABAU, Gerald Froschauer, IT Manager at HABAU, Peter Reisinger, Managing Director of EPS, Claus Hofer, Deputy Head of IT at HABAU in a group photo.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU-1080x721.jpg\" alt=\"Interview round with HABAU GROUP and EPS Electric Power Systems GmbH\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_2-1080x721.jpg\" alt=\"Peter Reisinger, Managing Director of EPS Electric Power Systems in an interview with HABAU GROUP.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_3-1080x721.jpg\" alt=\"Paul Muehlb\u00e4chler, IT Services at HABAU GROUP, Gerald Froschauer, IT Manager at HABAU GROUP, Claus Hofer, Deputy Head of IT at HABAU GROUP, and Peter Reisinger, Managing Director of EPS Electric Power Systems GmbH, in conversation.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_4-1080x721.jpg\" alt=\"Claus Hofer, Deputy Head of IT at HABAU GROUP, Peter Reisinger, Managing Director of EPS Electric Power Systems GmbH, Gerald Froschauer, Head of IT at HABAU GROUP, and Paul Muehlb\u00e4chler, IT Services Infrastructure Server at HABAU GROUP, are standing in the entrance area of HABAU in Perg.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_11-1080x721.jpg\" alt=\"Peter Reisinger, Managing Director of EPS, is standing in the technical room at HABAU GROUP.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_12-1080x721.jpg\" alt=\"Paul Muehlbachler, IT Services Infrastructure Server, checks the UPS systems.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 8\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_HABAU_14-1080x721.jpg\" alt=\"Noise-saving enclosure of a compressor.\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-de75775 e-flex e-con-boxed e-con e-parent\" data-id=\"de75775\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-bb8bd4b e-con-full e-flex e-con e-child\" data-id=\"bb8bd4b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-31b8c58 elementor-widget elementor-widget-text-editor\" data-id=\"31b8c58\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Tailor-made implementation during ongoing operations<\/h3><p>The special challenge: The conversion had to be carried out while IT operations were ongoing \u2013 including relocating the network infrastructure to the new data center. EPS planned the project holistically and implemented it within two years in close coordination with the HABAU team. The result: a modern, future-proof data center with a separate battery and technical room, redundant <a href=\"https:\/\/www.eps-dc.com\/en\/kategorie\/power-supply-ups-systems-emergency-power-generators\/ups-systems-ups-systems-ups-software-batteries\/\">power supply<\/a>, efficient cooling and oxygen reduction for fire protection.  <\/p><p>Special technical solutions were also implemented, such as the noise-saving housing of a compressor, which had to be installed on the building fa\u00e7ade opposite residential buildings.<\/p><p>&#8220;It was clear to us that we needed a full-service provider \u2013 technically, organizationally and personally. With EPS, we had a partner on an equal footing who combines competence, flexibility and trustworthiness,&#8221; emphasises Claus Hofer, Deputy Head of IT at HABAU. <\/p><h3>Investment in data security and scalability<\/h3><p>With the new data center, HABAU is not only ensuring business continuity, but also long-term control over sensitive company data. Around 80% of the systems will continue to be operated in-house \u2013 a strategic statement for data sovereignty and investment protection. <\/p><p>&#8220;If you think in a future-oriented way, you don&#8217;t just invest in buildings or machines, but in your digital infrastructure,&#8221; says Paul M\u00fchlbachler, Infrastructure Server. &#8220;EPS convinced us with its know-how and practical relevance \u2013 from the conception to the last socket.&#8221; <\/p><p>EPS is also very satisfied: &#8220;The cooperation with HABAU was characterized by trust and professionalism,&#8221; says Peter Reisinger, Sales Manager at EPS. &#8220;We are pleased to have laid a strong foundation for the digital future together.&#8221; <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-301b018 e-con-full e-flex e-con e-child\" data-id=\"301b018\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-941f706 e-con-full e-flex e-con e-child\" data-id=\"941f706\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2e7493c elementor-widget elementor-widget-heading\" data-id=\"2e7493c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fbc22f0 elementor-widget elementor-widget-text-editor\" data-id=\"fbc22f0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Planning &amp; Concept<ul><li>Requirements analysis<\/li><li>Feasibility study with site coordination<\/li><li>Creation of data center floor plan layouts and concepts<\/li><li>Plant and assembly planning<\/li><\/ul><\/li><li>Building construction<ul><li>Protection zone concept: IT whitespace &amp; greyspace such as UPS\/NSHV rooms, battery room<\/li><li>IT raised floor<\/li><\/ul><\/li><li>Cooling &amp; Energy Supply<ul><li>IT air conditioning: Air cooling with 2N redundant N DX systems<\/li><li>IT-RCS server racks with integrated cold\/hot aisle separation<\/li><li>IT UPS system: Modular and scalable, 2N<\/li><li>IT switchgear with UPS-EBS, emergency power switchover and RCM measurement, 2N<\/li><\/ul><\/li><li>Security &amp; Surveillance<ul><li>IT-technical fire protection: RAS detection &amp; technical fire prevention<\/li><li>IT leak warning system: digital comprehensive system for maximum protection<\/li><li>Monitoring &amp; fault alarm system: Real-time monitoring system with alarm<\/li><\/ul><\/li><li>Commission tests:<ul><li>Trial operation, load test and cross-trade overall function test<\/li><\/ul><\/li><li> <\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6cd8f73 e-flex e-con-boxed e-con e-parent\" data-id=\"6cd8f73\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-ffef268 e-con-full e-flex e-con e-child\" data-id=\"ffef268\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-a13df30 e-con-full e-flex e-con e-child\" data-id=\"a13df30\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-59c1c97 e-con-full e-flex e-con e-child\" data-id=\"59c1c97\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-3dce04d e-con-full e-flex e-con e-child\" data-id=\"3dce04d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a29e9fb elementor-widget elementor-widget-text-editor\" data-id=\"a29e9fb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f1f0a7b elementor-widget elementor-widget-text-editor\" data-id=\"f1f0a7b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the HABAU GROUP press release as PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3021776 elementor-widget elementor-widget-button\" data-id=\"3021776\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2026\/03\/EPS_Pressemitteilung_HABAU.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-21674e2 e-con-full e-flex e-con e-child\" data-id=\"21674e2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c14d708 e-con-full e-flex e-con e-child\" data-id=\"c14d708\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8e95fe4 elementor-widget elementor-widget-text-editor\" data-id=\"8e95fe4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-86f2e39 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"86f2e39\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.wirtschaftszeit.at\/news\/habau-modernisiert-it-infrastruktur-mit-neuem-rechenzentrum-von-eps-electric-power-systems\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Wirtschaftszeit.at<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.ittbusiness.at\/article\/neues-rechenzentrum-staerkt-digitale-eigenstaendigkeitder-HABAU-GROUP\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IT&amp;T Business<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The HABAU GROUP has invested in the modernization of its IT infrastructure \u2013 with a high-availability data center, planned and implemented by EPS Electric Power Systems. The owner-managed family business with around 6,500 employees has been operating internationally for more than a century and is now one of the leading players in the Austrian construction industry. Whether it&#8217;s building construction, civil engineering, tunnel construction or pipeline construction, the HABAU GROUP is broadly positioned \u2013 and therefore also needs an IT infrastructure that can keep pace with this complexity.  <\/p>\n","protected":false},"featured_media":29788,"template":"","class_list":["post-29822","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29822\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/29788"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=29822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":29494,"date":"2025-09-11T16:00:23","date_gmt":"2025-09-11T14:00:23","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/hochwasser-2024-container-eps-it-wuerth\/"},"modified":"2026-03-18T15:12:17","modified_gmt":"2026-03-18T14:12:17","slug":"hochwasser-2024-container-eps-it-wuerth","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/hochwasser-2024-container-eps-it-wuerth\/","title":{"rendered":"Flood 2024: Container solution from EPS secures IT operations at W\u00fcrth Austria"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29494\" class=\"elementor elementor-29494 elementor-29466\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9448646 e-flex e-con-boxed e-con e-parent\" data-id=\"9448646\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-534b25f e-con-full e-flex e-con e-child\" data-id=\"534b25f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7e9f689 elementor-widget elementor-widget-text-editor\" data-id=\"7e9f689\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>After the devastating flood in Lower Austria in 2024, the IT infrastructure of the W\u00fcrth branch in B\u00f6heimkirchen came to a complete standstill. With a container solution from EPS Electric Power Systems deployed at short notice, operations were quickly restored and a second data center was set up in the long term. <\/em><\/p><p><em>Maria-Anzbach\/B\u00f6heimkirchen, 11 September 2025 \u2013 <\/em>  The flood event in Lower Austria in autumn 2024 was one of the most serious in decades. The municipality of B\u00f6heimkirchen was particularly affected, where entire streets were under water \u2013 including the premises of W\u00fcrth Austria. In addition to structural damage, the IT infrastructure was particularly affected: The server room in the basement was completely under water \u2013 all IT services were paralyzed. <\/p><p>In order to quickly restore operations, W\u00fcrth relied on a mobile and immediately available solution from EPS Electric Power Systems. Within a few days, EPS installed a <a href=\"https:\/\/www.eps-dc.com\/en\/dc-containers\/\">data center container<\/a> (DC CONT) directly on the company premises \u2013 including complete cabling and operational infrastructure. The temporary emergency solution was provided free of charge by EPS and quickly proved to be a reliable replacement for the failed server room.  <\/p><p>&#8220;When it became clear that our server room was unusable due to the flooding, it was clear to us that we immediately needed a functioning alternative to protect our IT systems. The container solution enabled us to rebuild stable IT operations within a few days \u2013 and with significantly higher reliability than before,&#8221; says Alfred Wurmbrand, Managing Director of W\u00fcrth Austria. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b5fc284 e-con-full e-flex e-con e-child\" data-id=\"b5fc284\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e03d613 elementor-widget elementor-widget-testimonial\" data-id=\"e03d613\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"When I arrived, I was deeply shaken. This devastation and the oppressive silence, I had never seen anything like it. It was immediately clear to me that our task is to provide a practicable and resilient solution as quickly as possible, even in such a crisis situation. With the container solution, W\u00fcrth was not only able to react in the short term, but at the same time create a strategically sensible expansion of the IT infrastructure that can be used in the long term.\"   <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\"><img fetchpriority=\"high\" decoding=\"async\" alt=\"Peter Reisinger, neuer Geschaeftsfuehrer von EPS\" width=\"2200\" height=\"1467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265.jpg\" class=\"attachment-full size-full wp-image-24574\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265.jpg 2200w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1080x720.jpg 1080w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-300x200.jpg 300w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-768x512.jpg 768w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1536x1024.jpg 1536w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-2048x1366.jpg 2048w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-600x400.jpg 600w\" sizes=\"(max-width: 2200px) 100vw, 2200px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Peter Reisinger<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Managing Director of EPS  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a72e639 e-flex e-con-boxed e-con e-parent\" data-id=\"a72e639\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c2dc82a elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"c2dc82a\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_Uebersichtsbild-1080x720.jpg\" alt=\"You can see Peter Reisinger, Managing Director of EPS Electric Power Systems GmbH, Alfred Wurmbrand, Managing Director of Wuerth Oesterreich, and Christian Puchmayr, Head of IT at Wuerth Oesterreich.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_5-1080x810.jpg\" alt=\"Peter Reisinger, Managing Director of EPS, Irene Mondon-Stutterecker, Marketing and PR at EPS, and Christian Puchmayr, IT Manager at Wuerth, in an interview about the new DC-CONT Datacenter Container.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_2-1080x720.jpg\" alt=\"Data center container from EPS seen from the side.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_Datacenter_Container-1080x720.jpg\" alt=\"Here you can see the data center container from EPS, set up and in operation at Wuerth in Boeheimkirchen.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_Datacenter_Container_1-1080x720.jpg\" alt=\"Here you can see Christian Puchmayr, Head of IT at Wuerth Oesterreich, entering the Datacenter Container.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_3-1080x720.jpg\" alt=\"Christian Puchmayr, Head of IT at Wuerth, and Peter Reisinger, Managing Director of EPS, discuss the IT cooling in the RCS rack in the data center container.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_4-1080x720.jpg\" alt=\"Christian Puchmayr and Peter Reisinger are standing in front of the Container data center in Boeheimkirchen.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_6-1080x720.jpg\" alt=\"Peter Reisinger and Christian Puchmayr open an RCS server rack in a data center container.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"9 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_7-1080x720.jpg\" alt=\"IT cooling is provided by RCS server racks with integrated, adjustable cold air fins and cold\/hot aisle separation\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"10 of 10\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/09\/EPS_Wuerth_8-1080x720.jpg\" alt=\"Christian Puchmayr and Peter Reisinger shake hands in front of the data center container.\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-00eaf6b e-flex e-con-boxed e-con e-parent\" data-id=\"00eaf6b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-0da4b56 e-con-full e-flex e-con e-child\" data-id=\"0da4b56\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-09c0848 elementor-widget elementor-widget-text-editor\" data-id=\"09c0848\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Second data center permanently in use<\/h3><p>In addition to restoring IT operations, the container solution brought long-term benefits: <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/regulated-cooling-solution-rcs-air-conditioned-19-rack\/\">IT cooling<\/a> is provided by RCS server racks with integrated, adjustable cold air fins and cold\/hot aisle separation. This increases energy efficiency and reduces CO\u2082 emissions at the same time. The refrigeration is carried out in redundancy level 2N, as are the IT switchgear and the IT UPS systems. In addition, the waste heat from IT is used to heat the building.   <\/p><p>The originally planned emergency solution became a future-proof permanent solution: Today, W\u00fcrth operates the new data center permanently in the data center container, thus creating a future-proof IT infrastructure for the headquarters, logistics in B\u00f6heimkirchen and the 80 shops in Austria.<\/p><p>&#8220;When I arrived, I was deeply shaken. This devastation and the oppressive silence, I had never seen anything like it. It was immediately clear to me that our task is to provide a practicable and resilient solution as quickly as possible, even in such a crisis situation. With the container solution, W\u00fcrth was not only able to react in the short term, but at the same time create a strategically sensible expansion of the IT infrastructure that can be used in the long term,&#8221; says Peter Reisinger, Managing Director of EPS.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6c57628 e-con-full e-flex e-con e-child\" data-id=\"6c57628\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-769c1a4 e-con-full e-flex e-con e-child\" data-id=\"769c1a4\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-25f65cf elementor-widget elementor-widget-heading\" data-id=\"25f65cf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5cff761 elementor-widget elementor-widget-text-editor\" data-id=\"5cff761\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>IT-DCC 20 Foot Container EI90 ISO High Cube<\/li><li>IT-DCC raised floor for data center with IT whitespace<\/li><li>IT-DCC Cable Routing System for Fiber Optic &amp; CU Data Cabling<\/li><li>IT-DCC RCS server\/network racks with integrated cold aisle sealing and targeted cold air supply<\/li><li>IT-DCC RZ air conditioning system in redundancy level 2N<\/li><li>Modular and scalable IT UPS system with 20KVA<\/li><li>IT switchgear<\/li><li>IT-DCC Early Fire Detection<\/li><li>IT-DCC Fire Prevention System<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-14d6232 e-flex e-con-boxed e-con e-parent\" data-id=\"14d6232\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-0569653 e-con-full e-flex e-con e-child\" data-id=\"0569653\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-4746c8b e-con-full e-flex e-con e-child\" data-id=\"4746c8b\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-ba988d7 e-con-full e-flex e-con e-child\" data-id=\"ba988d7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d6264bb elementor-widget elementor-widget-text-editor\" data-id=\"d6264bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d7bdb12 elementor-widget elementor-widget-text-editor\" data-id=\"d7bdb12\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the W\u00fcrth press release as PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e5af42a elementor-widget elementor-widget-button\" data-id=\"e5af42a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2026\/03\/EPS_Wuerth_Pressemitteilung.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6a685f0 e-con-full e-flex e-con e-child\" data-id=\"6a685f0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-19b51b3 e-con-full e-flex e-con e-child\" data-id=\"19b51b3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1a200ef elementor-widget elementor-widget-text-editor\" data-id=\"1a200ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d62b372 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d62b372\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/leitbetriebe.at\/hochwasser-2024-containerloesung-von-eps-sichert-it-betrieb-bei-wuerth-oesterreich\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Leitbetriebe Austria  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.noen.at\/neulengbach\/wirtschaft-nach-hochwasser-container-wurde-zur-dauerloesung-490646240\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">N\u00d6N Neulengbach<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/buildingtimes.at\/allgemein\/containerloesung-fuer-it\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Building Times  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.uncovr.com\/Articles\/containerrechenzentrum-rettet-wuerthit-nach-hochwasser-85903\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">uncovr<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/i-magazin.com\/container-sichert-it-bei-hochwasser\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">i-Magazine<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>After the devastating flood in Lower Austria in 2024, the IT infrastructure of the W\u00fcrth branch in B\u00f6heimkirchen came to a complete standstill. With a container solution from EPS Electric Power Systems deployed at short notice, operations were quickly restored and a second data center was set up in the long term. <\/p>\n","protected":false},"featured_media":29475,"template":"","class_list":["post-29494","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29494\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/29475"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=29494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":29378,"date":"2025-08-21T13:07:18","date_gmt":"2025-08-21T11:07:18","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/test-fuchs-neue-serverinfrastruktur-eps\/"},"modified":"2025-09-08T15:02:41","modified_gmt":"2025-09-08T13:02:41","slug":"test-fuchs-neue-serverinfrastruktur-eps","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/test-fuchs-neue-serverinfrastruktur-eps\/","title":{"rendered":"TEST-FUCHS modernizes server infrastructure with the support of EPS Electric Power Systems"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29378\" class=\"elementor elementor-29378 elementor-29371\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-692c8fd e-flex e-con-boxed e-con e-parent\" data-id=\"692c8fd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-a6a16c0 e-con-full e-flex e-con e-child\" data-id=\"a6a16c0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1563e86 elementor-widget elementor-widget-text-editor\" data-id=\"1563e86\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Maria Anzbach \/ Gro\u00df-Siegharts \u2013 The internationally active family-owned company TEST-FUCHS has comprehensively renewed its IT infrastructure at its headquarters in Gro\u00df-Siegharts. The central measure was the construction of a modern, high-availability on-premise server room including new servers, storage systems and network solutions. The project was implemented by the Lower Austrian company EPS Electric Power Systems GmbH, a leading provider of complete data center and power supply solutions.    <\/em><\/p><p>The existing server room at TEST-FUCHS was no longer able to cope with the increased requirements. The goal was therefore to create a future-proof, scalable and energy-efficient solution that would ensure ongoing operations even under difficult conditions. Particular attention was paid to the so-called &#8220;transparent migration&#8221;, which enabled a seamless transition without interruptions. &#8220;Our new server room is the heart of our IT infrastructure. With this investment, we are creating a reliable basis for our global IT operations, securing our locations in the long term and ensuring the highest level of data sovereignty through local control and administration,&#8221; emphasizes Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS.    <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-236b4af e-con-full e-flex e-con e-child\" data-id=\"236b4af\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d667ef3 elementor-widget elementor-widget-testimonial\" data-id=\"d667ef3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"The close coordination with all those involved was crucial for the smooth running of the event. We are pleased to have contributed to the modernization of TEST-FUCHS' IT infrastructure.\" <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/team\/anna-weixlbraun\/\"><img decoding=\"async\" alt=\"Anna Weixlbraun, Support Projektmanagement bei EPS\" width=\"700\" height=\"467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2022\/11\/EPS_Anna_Weixlbraun.jpg\" class=\"attachment-medium_large size-medium_large wp-image-18567\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2022\/11\/EPS_Anna_Weixlbraun.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2022\/11\/EPS_Anna_Weixlbraun-600x400.jpg 600w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2022\/11\/EPS_Anna_Weixlbraun-300x200.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/team\/anna-weixlbraun\/\">Anna Weixlbraun<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/team\/anna-weixlbraun\/\">Support project management at EPS<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ee59d57 e-flex e-con-boxed e-con e-parent\" data-id=\"ee59d57\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f8397ae elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"f8397ae\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_1-1080x720.jpg\" alt=\"Aircraft model and logo of TEST-FUCHS in front of the main building in Gross-Siegharts.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_2-1080x720.jpg\" alt=\"Peter Reisinger, Managing Director of EPS, Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS, Christopher Ferkl, IT Manager at TEST-FUCHS, Anna Weixlbraun, Support Project Management at EPS and Irene Mondon-Stutterecker sit together at the table and conduct an interview.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_5-1080x720.jpg\" alt=\"Peter Reisinger, Managing Director of EPS, in conversation with Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_6-1080x720.jpg\" alt=\"You can see Christopher Ferkl, Head of IT at TEST-FUCHS, Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS, Peter Reisinger, Managing Director of EPS, and Anna Weixlbraun, Support Project Management at EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_7-1080x720.jpg\" alt=\"Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS, as he enters the new server room.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_8-1080x720.jpg\" alt=\"Anna Weixlbraun, Support Project Management at EPS, tests the new UPS system.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_10-1080x720.jpg\" alt=\"You can see the inner workings of the UPS system with targeted air cooling.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_11-1080x720.jpg\" alt=\"Use of RCS server racks with integrated cold and hot aisle isolation.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"9 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_12-1080x720.jpg\" alt=\"Use of a technical fire prevention system to implement preventive fire protection in the IT areas of white and greyspace\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"10 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_13-1080x720.jpg\" alt=\"UPS battery system from EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"11 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_14-1080x720.jpg\" alt=\"UPS system in the data center\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"12 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_15-1080x720.jpg\" alt=\"Volker Fuchs, Managing Director of TEST-FUCHS, and Peter Reisinger, Managing Director of EPS, are standing in the new server room.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"13 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_18-1080x720.jpg\" alt=\"Christopher Ferkl, IT Manager at TEST-FUCHS, Anna Weixlbraun, Support Project Management at EPS, Volker Fuchs, Managing Director of TEST-FUCHS, Peter Reisinger, Managing Director of EPS, and Bernhard Weber, Head of IT Infrastructure at TEST-FUCHS, are standing on the upper floor of the passageway and looking down.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"14 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_19-1080x720.jpg\" alt=\"Volker Fuchs, Managing Director of TEST-FUCHS, and Peter Reisinger, Managing Director of EPS, sit together for an interview.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"15 of 15\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_20-1080x720.jpg\" alt=\"Peter Reisinger, Managing Director of EPS, Volker Fuchs, Managing Director of TEST-FUCHs, Bernhard Weber, IT Infrastructure of TEST-FUCHS, Anna Weixlbraun, Support Project Management of EPS, and Christopher Ferkl, IT Manager at TEST-FUCHS are standing in front of the entrance to the main building in Gross-Siegharts.\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d26848b e-flex e-con-boxed e-con e-parent\" data-id=\"d26848b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-c504f63 e-con-full e-flex e-con e-child\" data-id=\"c504f63\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-dad6b35 elementor-widget elementor-widget-text-editor\" data-id=\"dad6b35\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The new <a href=\"https:\/\/www.eps-dc.com\/en\/serverraum-planung-beratung-errichtung\/\">server room<\/a> also supports TEST-FUCHS&#8217; ongoing ISO 27001 certification in the field of IT security and information security.<\/p><p>In addition to the technical implementation, the project management also placed high demands, among other things through coordination with authorities, suppliers and construction companies. Anna Weixlbraun, Support Project Management at EPS, adds: &#8220;The close coordination with all parties involved was crucial for the smooth process. We are pleased to have contributed to the modernization of TEST-FUCHS&#8217; IT infrastructure.&#8221;  <\/p><p>&#8220;It makes me proud that two innovative and technologically leading companies from the Waldviertel are jointly implementing such a forward-looking project. This not only strengthens the region, but also shows the potential of our homeland,&#8221; says Peter Reisinger, Managing Director of EPS. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-105973c e-con-full e-flex e-con e-child\" data-id=\"105973c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-24be628 e-con-full e-flex e-con e-child\" data-id=\"24be628\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0f083ee elementor-widget elementor-widget-heading\" data-id=\"0f083ee\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9fb34e1 elementor-widget elementor-widget-text-editor\" data-id=\"9fb34e1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Redundant design of critical infrastructure systems such as UPS system and air conditioning to ensure high availability. Scalable, modular architecture for flexible growth <\/li><li>  Energy-efficient, hybrid cooling technology with built-in redundancy, based on the use of the in-house chilled water system<\/li><li>Security concept with protection zone concept according to EN50600 for access to the server room<\/li><li>Use of a technical fire prevention system to implement preventive fire protection in the IT areas of white and greyspace<\/li><\/ul><p> <\/p><ul><li>Targeted air cooling and granular temperature monitoring through the use of RCS server racks with integrated cold and hot aisle isolation<\/li><li>Carrying out a commissioning test to check the proper functioning and interaction of the entire technical infrastructure<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ea3e01a e-flex e-con-boxed e-con e-parent\" data-id=\"ea3e01a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-776c26d e-con-full e-flex e-con e-child\" data-id=\"776c26d\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-6faa43c e-con-full e-flex e-con e-child\" data-id=\"6faa43c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6be656e elementor-widget elementor-widget-text-editor\" data-id=\"6be656e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-db827d8 elementor-widget elementor-widget-text-editor\" data-id=\"db827d8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the TEST-FUCHS Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f519b4a elementor-widget elementor-widget-button\" data-id=\"f519b4a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/08\/EPS_Test_Fuchs_Pressemitteilung.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-63139ea e-con-full e-flex e-con e-child\" data-id=\"63139ea\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-14406ed e-con-full e-flex e-con e-child\" data-id=\"14406ed\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f89fbe8 elementor-widget elementor-widget-text-editor\" data-id=\"f89fbe8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-80afd73 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"80afd73\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.noen.at\/waidhofen\/modernisierung-auf-neuestem-stand-test-fuchs-modernisiert-serverinfrastruktur-487364452\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">N\u00d6N Waidhofen  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/leitbetriebe.at\/test-fuchs-modernisiert-serverinfrastruktur-mit-unterstuetzung-von-eps-electric-power-systems\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Leitbetriebe Austria  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The internationally active family-owned company TEST-FUCHS has comprehensively renewed its IT infrastructure at its headquarters in Gro\u00df-Siegharts. The central measure was the construction of a modern, high-availability on-premise server room including new servers, storage systems and network solutions. The project was implemented by the Lower Austrian company EPS Electric Power Systems GmbH, a leading provider of complete data center and power supply solutions.  <\/p>\n","protected":false},"featured_media":29376,"template":"","class_list":["post-29378","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29378\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/29376"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=29378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":29235,"date":"2025-06-12T16:22:28","date_gmt":"2025-06-12T14:22:28","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/eps-electric-power-systems-realisiert-serverraum-fuer-silicon-austria-labs\/"},"modified":"2026-01-26T16:03:59","modified_gmt":"2026-01-26T15:03:59","slug":"eps-serverraum-fuer-silicon-austria-labs","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/eps-serverraum-fuer-silicon-austria-labs\/","title":{"rendered":"EPS Electric Power Systems realizes server room for Silicon Austria Labs"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29235\" class=\"elementor elementor-29235 elementor-29230\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-14feab4 e-flex e-con-boxed e-con e-parent\" data-id=\"14feab4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-47e9625 e-con-full e-flex e-con e-child\" data-id=\"47e9625\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8f2c211 elementor-widget elementor-widget-text-editor\" data-id=\"8f2c211\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>As part of the construction of a new research building at the Villach site, Silicon Austria Labs GmbH has implemented a future-proof server room solution together with EPS Electric Power Systems. The Austrian data center specialist EPS was responsible for the design, planning and implementation of the infrastructure. <\/em><\/p><p>Maria Anzbach \/ Villach \u2013 Silicon Austria Labs GmbH (SAL) is Austria&#8217;s top research center for electronics and software-based systems with around 350 employees at its locations in Graz, Villach and Linz. In order to meet the increasing demands on computing power for simulation-intensive research work, the company decided to expand its server capacities at the Villach site. In their search for a suitable solution, Silicon Austria Labs came across the Lower Austrian family-owned company EPS, which specializes in holistic, energy-efficient <a href=\"https:\/\/www.eps-dc.com\/en\/serverraum-planung-beratung-errichtung\/\">data center solutions<\/a> .  <\/p><p>&#8220;A smoothly functioning server room is of central importance for our work \u2013 especially when it comes to running complex research simulations,&#8221; explains Andreas Primoschitz, Head of IT at Silicon Austria Labs. &#8220;The cooperation with EPS was very efficient \u2013 from planning to commissioning, we were able to rely on a central contact person, which made the implementation much easier.&#8221; <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8df4924 e-con-full e-flex e-con e-child\" data-id=\"8df4924\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0f08dba elementor-widget elementor-widget-testimonial\" data-id=\"0f08dba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">The project shows once again how important tailor-made and energy-efficient data center solutions are for research-intensive companies. We are particularly pleased that we were able to convince with our concept of the RCS server rack as an adjustable single-rack cooling system \u2013 a solution that brings clear advantages both in ongoing operation and in terms of sustainability and has a noticeably positive effect on power consumption and thus also on CO2 emissions.\" <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/en\/team\/michael-kainrath\/\"><img decoding=\"async\" alt=\"Michael Kainrath, Vertrieb EPS\" width=\"700\" height=\"467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/03\/EPS_Michael_Kainrath.jpg\" class=\"attachment-medium_large size-medium_large wp-image-18581\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/03\/EPS_Michael_Kainrath.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/03\/EPS_Michael_Kainrath-600x400.jpg 600w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/03\/EPS_Michael_Kainrath-300x200.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/en\/team\/michael-kainrath\/\">Michael Kainrath<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/en\/team\/michael-kainrath\/\">Sales at EPS<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-03a04d6 e-flex e-con-boxed e-con e-parent\" data-id=\"03a04d6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-37188bd elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"37188bd\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_1-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_1\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_2-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_2\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_3-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_3\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_4-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_4\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_5-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_5\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_6-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_6\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_7-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_7\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_8-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_8\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"9 of 9\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/EPS_Silicon_Labs_Austria_9-1080x720.jpg\" alt=\"EPS_Silicon_Labs_Austria_9\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3a35e80 e-flex e-con-boxed e-con e-parent\" data-id=\"3a35e80\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-d982d15 e-con-full e-flex e-con e-child\" data-id=\"d982d15\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-917f270 elementor-widget elementor-widget-text-editor\" data-id=\"917f270\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Adjustable rack cooling for greater sustainability<\/h3><p>The innovative <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/regulated-cooling-solution-rcs-air-conditioned-19-rack\/\">RCS server rack cooling concept<\/a> is special, which enables more flexible and precise air flow as well as higher energy efficiency compared to classic cold\/hot aisle solutions. The new on-premise server room in Villach is equipped with ten RCS racks including integrated cold aisle partitioning and offers space reserves for future scaling. The IT power supply is redundant throughout from the transfer point of the primary distribution to the tertiary distribution and has two separate supply lines and IT UPS systems with a redundancy level of 2N \u2013 and thus meets the highest requirements for reliability and availability.<\/p><p>The infrastructure is supplemented by 2N redundant IT air conditioning, highly sensitive <a href=\"https:\/\/www.eps-dc.com\/en\/brandschutz-serverraum\/\">smoke aspiration systems<\/a>, a gas-based fire extinguishing system and a comprehensive leak warning system. A higher-level monitoring system with corresponding sensors for granular monitoring of the infrastructure ensures maximum safety during ongoing data center operation. The entire planning and implementation was based on the European data center standard EN 50600.<\/p><p>With the completion of the project in Villach, SAL was able to sustainably expand its IT infrastructure and is thus well positioned for future research requirements.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8ccef83 e-con-full e-flex e-con e-child\" data-id=\"8ccef83\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-8039d36 e-con-full e-flex e-con e-child\" data-id=\"8039d36\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d6b7fb1 elementor-widget elementor-widget-heading\" data-id=\"d6b7fb1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d90bd8 elementor-widget elementor-widget-text-editor\" data-id=\"0d90bd8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>In-house data center infrastructure<\/li><li>50kW IT power with A+B multi-path power supply<\/li><li>DCIS RZ Cable Routing Systems<\/li><li>10 individual server racks with integrated cold aisle bulking and targeted cold air supply<\/li><li>DCIS RZ NST UPS Power Distribution<\/li><li>DCIS RZ Equipotential bonding system for the entire data center area<\/li><li>DCIS RZ system testing according to \u00d6VE8101 and documentation<\/li><li>DCIS Data Center Leak Detection System for the Entire Data Center Area<\/li><li>DCIS RZ Blower Door Test to Determine Room Tightness<\/li><li>DCIS data center commissioning with trial operation, load test and overall function test<\/li><li>DCIS RZ Project Management\/Consulting\/CAD Planning<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a67f054 e-flex e-con-boxed e-con e-parent\" data-id=\"a67f054\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-1ba9cc6 e-con-full e-flex e-con e-child\" data-id=\"1ba9cc6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-f5e207b e-con-full e-flex e-con e-child\" data-id=\"f5e207b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-92aa76f e-con-full e-flex e-con e-child\" data-id=\"92aa76f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-7deb0ec e-con-full e-flex e-con e-child\" data-id=\"7deb0ec\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-71afe7e e-con-full e-flex e-con e-child\" data-id=\"71afe7e\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-8ef0952 e-con-full e-flex e-con e-child\" data-id=\"8ef0952\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2864a9b elementor-widget elementor-widget-text-editor\" data-id=\"2864a9b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-33b25d0 elementor-widget elementor-widget-text-editor\" data-id=\"33b25d0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the Silicon Austria Labs Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-70dc78a elementor-widget elementor-widget-button\" data-id=\"70dc78a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/06\/PA_EPS_Silicon_Austria_Labs_komprimiert.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c42f692 e-con-full e-flex e-con e-child\" data-id=\"c42f692\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-fb91bef e-con-full e-flex e-con e-child\" data-id=\"fb91bef\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b246bc8 elementor-widget elementor-widget-text-editor\" data-id=\"b246bc8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7b57688 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"7b57688\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.advantage.at\/artikel\/sal-setzt-auf-zukunftssichere-server-loesung\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Advantage  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/elektropraxis.at\/elektrotechnik\/cool-bleiben-beim-forschen\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Electrical Practice<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>As part of the construction of a new research building at the Villach site, Silicon Austria Labs GmbH has implemented a future-proof server room solution together with EPS Electric Power Systems. The Austrian data center specialist EPS was responsible for the design, planning and implementation of the infrastructure. <\/p>\n","protected":false},"featured_media":29234,"template":"","class_list":["post-29235","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29235\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/29234"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=29235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":29094,"date":"2025-05-07T10:38:34","date_gmt":"2025-05-07T08:38:34","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/eps-electric-power-systems-errichtet-hochmodernes-rechenzentrum-fuer-voestalpine-tubulars\/"},"modified":"2025-11-17T11:06:55","modified_gmt":"2025-11-17T10:06:55","slug":"eps-hochmodernes-rechenzentrum","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/eps-hochmodernes-rechenzentrum\/","title":{"rendered":"EPS Electric Power Systems Builds State-of-the-Art Data Center for voestalpine Tubulars"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"29094\" class=\"elementor elementor-29094 elementor-29089\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-58922cc e-flex e-con-boxed e-con e-parent\" data-id=\"58922cc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-5c5a87d e-con-full e-flex e-con e-child\" data-id=\"5c5a87d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-70dcd35 elementor-widget elementor-widget-text-editor\" data-id=\"70dcd35\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Maria Anzbach \/ Kindberg- With the newly built data center in Kindberg, voestalpine Tubulars GmbH &amp; Co KG is relying on state-of-the-art IT infrastructure and maximum reliability. The planning and implementation of the data center was carried out by EPS Electric Power Systems, an established provider of data center and safety power supply solutions in Central Europe. The project marks another successful milestone in the long-standing cooperation between the two Austrian companies, which began in 2018 with the construction of a first server room.  <\/em><\/p><h3>State-of-the-art data center sets standards in security, availability and sustainability<\/h3><p>After an intensive planning phase, the decision was made in 2023 to build a stand-alone building as a data center that meets the highest security and availability standards. At the heart of the concept is a normative protection zone concept that ensures physical protection and access control at the highest level. The highly available, geo-redundant server room is equipped with redundant <a href=\"https:\/\/www.eps-dc.com\/en\/kategorie\/power-supply-ups-systems-emergency-power-generators\/ups-systems-ups-systems-ups-software-batteries\/\">UPS systems<\/a> that guarantee the highest level of reliability. This is complemented by a high-performance cooling system that relies on RCS racks with targeted cold air ducting. This technology ensures precise and efficient <a href=\"https:\/\/www.eps-dc.com\/en\/klimatisierung\/\">cooling of IT systems<\/a> while optimizing energy consumption. Cooling is generated via redundant IT air conditioning systems with a free-cooling function, which make a further contribution to the energy efficiency and sustainability of the entire data center.     <\/p><p>With the new data center, voestalpine Tubulars GmbH &amp; Co KG is taking another important step towards a future-proof IT infrastructure. The production processes are optimally supported by the high reliability, the efficient energy supply and the modern cooling solution. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-69c0320 e-con-full e-flex e-con e-child\" data-id=\"69c0320\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-88fe8fa elementor-widget elementor-widget-testimonial\" data-id=\"88fe8fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"We are proud to have voestalpine Tubulars GmbH &amp; Co KG as a long-standing and reliable partner at our side. The jointly realized data center once again underlines our claim to provide state-of-the-art, sustainable and efficient IT infrastructure solutions. With innovative technology and our many years of experience, we offer our customers maximum availability and safety at the top international level.\"<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Peter Reisinger, neuer Geschaeftsfuehrer von EPS\" width=\"700\" height=\"467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg\" class=\"attachment-medium size-medium wp-image-24574\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1080x720.jpg 1080w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-300x200.jpg 300w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-768x512.jpg 768w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1536x1024.jpg 1536w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-2048x1366.jpg 2048w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-600x400.jpg 600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Peter Reisinger<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/en\/team\/peter-reisinger\/\">Managing Director of EPS  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-14328c1 e-flex e-con-boxed e-con e-parent\" data-id=\"14328c1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c16d465 elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"c16d465\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_Gruppenfoto-1080x720.jpg\" alt=\"You can see Michaela Sadleder, Managing Director of Eaton Austria and Switzerland, Christoph Klaminger, IT at voestalpine Tubulars, and Peter Reisinger, Managing Director of EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_25-1080x720.jpg\" alt=\"Christoph Klaminger, voestalpine Tubulars, and Peter Reisinger, Managing Director of EPS, are standing in front of the purpose-built data center building of voestalpine tubulars\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_16-1080x720.jpg\" alt=\"EPS&#039;s state-of-the-art data center for voestalpine Tubulars in Kindberg\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_7-1080x720.jpg\" alt=\"Peter Reisinger, EPS, together with Christoph Klaminger, voestalpine Tubulars, and Michaela Sadleder, Eaton Austria, in front of an Eaton UPS system\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_8-1080x720.jpg\" alt=\"Michaela Sadleder, Managing Director Eaton Oesterreich, Christoph Klaminger, voestalpine Tubulars, and Peter Reisinger, EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_2-1080x720.jpg\" alt=\"IT technical fire protection with RAS detection and technical fire prevention\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_6-1080x720.jpg\" alt=\"IT fire protection, real-time monitoring system\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_19-1080x720.jpg\" alt=\"Michaela Sadleder, Managing Director of Eaton Austria and Switzerland, Christoph Klaminger, voestalpine Tubulars, and Peter Reisinger, Managing Director of EPS, are in the redundant server room\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"9 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_3-1080x720.jpg\" alt=\"IT leak warning system with monitoring and fault detection system from EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"10 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_4-1080x720.jpg\" alt=\"Structured IT Interrack Cabling from EPS for voestalpine Tubulars\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"11 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_10-1080x720.jpg\" alt=\"IT switchgear with EBS and emergency power switchover from EPS for voestalpine Tubulars\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"12 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_12-1080x720.jpg\" alt=\"Christoph Klaminger, voestalpine Tubulars, in an interview with Michaela Sadleder, Managing Director of Eaton Austria and Switzerland, and Peter Reisinger, Managing Director of EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"13 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_13-1080x720.jpg\" alt=\"Display with voestalpine tubulars logo\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"14 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_17-1080x720.jpg\" alt=\"EPS redundant data center at voestalpine Tubulars\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"15 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_18-1080x720.jpg\" alt=\"IT interrack cabling in the server room of EPS at voestalpine Tubulars\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"16 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars-1080x720.jpg\" alt=\"Christoph Klaminger, voestalpine Tubulars, and Peter Reisinger, EPS Electric Power Systems, stand in front of the purpose-built voestalpine Tubulars data center building\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"17 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_20-1080x720.jpg\" alt=\"Peter Reisinger, EPS, together with Christoph Klaminger, voestalpine Tubulars, and Michaela Sadleder, Eaton Oesterreich, are standing in the technical room in front of the manifold building\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"18 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_21-1080x720.jpg\" alt=\"This is what the cabling and network infrastructure looks like in a server room\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"19 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_22-1080x720.jpg\" alt=\"Battery room ensures safe power supply in a server room\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"20 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"Sie sehen einen Technikraum mit Monitoring System, Verteilerbau, USV-Anlagen und Notstromaggregat inklusive technische Brandvermeidung\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_tubulars_technik.jpg\" alt=\"You will see a technical room with monitoring system, distribution structure, UPS systems and emergency power generator including technical fire prevention\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"21 of 21\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/11\/EPS_Voestalpine_tubulars_1-1080x720.jpg\" alt=\"Verkabelung und Netzwerkinfrastruktur von EPS\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1dc69e3 e-flex e-con-boxed e-con e-parent\" data-id=\"1dc69e3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-458ee1d e-con-full e-flex e-con e-child\" data-id=\"458ee1d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f6ce8f4 elementor-widget elementor-widget-text-editor\" data-id=\"f6ce8f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Efficiency and sustainability as important factors<\/h3><p>The new IT infrastructure focuses on energy efficiency, security and long-term economic efficiency. Eaton&#8217;s redundant, modular and scalable IT UPS systems ensure an uninterruptible power supply and have been seamlessly integrated into the overall concept. State-of-the-art safety solutions, including technical fire prevention and continuous monitoring, ensure smooth operation.<\/p><h3>Efficiency and sustainability as important factors<\/h3><p>The new IT infrastructure focuses on energy efficiency, security and long-term economic efficiency. Eaton&#8217;s redundant, modular and scalable IT UPS systems ensure an uninterruptible power supply and have been seamlessly integrated into the overall concept. State-of-the-art safety solutions, including technical <a href=\"https:\/\/www.eps-dc.com\/en\/brandschutz-serverraum\/\">fire prevention<\/a> and continuous monitoring, ensure smooth operation.  <\/p><p>&#8220;We are proud to have voestalpine Tubulars GmbH &amp; Co KG as a long-standing and reliable partner at our side. The jointly realized data center once again underlines our claim to provide state-of-the-art, sustainable and efficient IT infrastructure solutions. With innovative technology and our many years of experience, we offer our customers maximum availability and safety at the top international level,&#8221; emphasizes Peter Reisinger, Managing Director at EPS Electric Power Systems.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-86aa811 e-con-full e-flex e-con e-child\" data-id=\"86aa811\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-48143e0 e-con-full e-flex e-con e-child\" data-id=\"48143e0\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eedef86 elementor-widget elementor-widget-heading\" data-id=\"eedef86\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a354783 elementor-widget elementor-widget-text-editor\" data-id=\"a354783\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Planning &amp; Concept<ul><li>Requirements analysis<\/li><li>Feasibility study with site coordination<\/li><li>Creation of multiple data center floor plan layouts and concepts<\/li><li>Plant and assembly planning<\/li><\/ul><\/li><li>Building construction<ul><li>Protection zone concept: IT whitespace with climate bar, UPS\/NSHV rooms, battery room &amp; airlock<\/li><li>IT raised floor<\/li><\/ul><\/li><li>Cooling &amp; Energy Supply<ul><li>IT air conditioning: Indirect free cooling with 34 kW power, 2N<\/li><li>IT-RCS server racks with integrated cold\/hot aisle separation<\/li><li>IT UPS system: Modular and scalable, 50 kW power, 2N<\/li><li>IT UPS battery system: 10 minutes bridging time at 50 kW power, 2N<\/li><li>IT switchgear: With EBS and emergency power switching, 2N<\/li><\/ul><\/li><li>Security &amp; Surveillance<ul><li>IT-technical fire protection: RAS detection &amp; technical fire prevention<\/li><li>IT leak warning system: Comprehensive for maximum protection<\/li><li>Monitoring &amp; fault detection system: Real-time monitoring system<\/li><\/ul><\/li><li>Cabling and network infrastructure<ul><li>IT-Structured Interrack Cabling: Cat 8.1 + OM4 + OS2 MPO<\/li><\/ul><\/li><li>Commissioning &amp; Tests:<ul><li>Trial operation, load test and cross-trade overall function test<\/li><\/ul><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e3f9e5f e-flex e-con-boxed e-con e-parent\" data-id=\"e3f9e5f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-1d716fa e-con-full e-flex e-con e-child\" data-id=\"1d716fa\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-14820a1 e-con-full e-flex e-con e-child\" data-id=\"14820a1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-0b6e3a0 e-con-full e-flex e-con e-child\" data-id=\"0b6e3a0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-dfd0ab5 e-con-full e-flex e-con e-child\" data-id=\"dfd0ab5\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-0d2217d e-con-full e-flex e-con e-child\" data-id=\"0d2217d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6ba2c93 elementor-widget elementor-widget-text-editor\" data-id=\"6ba2c93\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-668a214 elementor-widget elementor-widget-text-editor\" data-id=\"668a214\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the voestalpine Tubulars Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-267fefb elementor-widget elementor-widget-button\" data-id=\"267fefb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_Voestalpine_Tubulars_Pressemitteilung_komprimiert.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6638c0f e-con-full e-flex e-con e-child\" data-id=\"6638c0f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2a758ec e-con-full e-flex e-con e-child\" data-id=\"2a758ec\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3c87588 elementor-widget elementor-widget-text-editor\" data-id=\"3c87588\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d93912d elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d93912d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/leitbetriebe.at\/eps-electric-power-systems-errichtet-hochmodernes-rechenzentrum-fuer-voestalpine-tubulars\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Leitbetriebe Austria  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/ittbusiness.at\/article\/EPS-errichtet-hochmodernes-rechenzentrum-fuer-voestalpine-turbulars\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IT&amp;T Business<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>With the newly built data center in Kindberg, voestalpine Tubulars GmbH &amp; Co KG is relying on state-of-the-art IT infrastructure and maximum reliability. The planning and implementation of the data center was carried out by EPS Electric Power Systems, an established provider of data center and safety power supply solutions in Central Europe. The project marks another successful milestone in the long-standing cooperation between the two Austrian companies, which began in 2018 with the construction of a first server room.  <\/p>\n","protected":false},"featured_media":29119,"template":"","class_list":["post-29094","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/29094\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/29119"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=29094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":28997,"date":"2025-04-09T13:06:06","date_gmt":"2025-04-09T11:06:06","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/it-infrastruktur-auf-spitzenniveau-eps-realisiert-hybride-rechenzentrumsloesung-fuer-laola1\/"},"modified":"2025-05-12T16:31:45","modified_gmt":"2025-05-12T14:31:45","slug":"it-infrastruktur-eps-rechenzentrum-laola1","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/it-infrastruktur-eps-rechenzentrum-laola1\/","title":{"rendered":"IT infrastructure at the highest level: EPS implements hybrid data center solution for LAOLA1"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28997\" class=\"elementor elementor-28997 elementor-28990\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e8749c7 e-flex e-con-boxed e-con e-parent\" data-id=\"e8749c7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-f140e1a e-con-full e-flex e-con e-child\" data-id=\"f140e1a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a1f0bd1 elementor-widget elementor-widget-text-editor\" data-id=\"a1f0bd1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>EPS Electric Power Solutions, a leading provider of individual server room solutions, has successfully implemented a state-of-the-art hybrid data center solution for LAOLA1, Austria&#8217;s largest digital sports field, at its new location in Vienna. The project combines local IT infrastructure with cloud solutions and meets the highest requirements in terms of availability, efficiency and latency. <\/em><\/p><h3>Full power for uninterrupted sports enjoyment<\/h3><p>With the relocation of LAOLA1, a company of the globally active Sportradar Group, to a new office building, the challenge arose to develop an IT infrastructure that would meet the complex requirements of a globally active video content provider. In addition to live commentators and studio broadcasts that are handled on site, video productions require low latency and maximum availability \u2013 even in the event of power outages. <\/p><p>&#8220;It quickly became clear to us that a purely cloud-based solution was not enough for us. A hybrid solution that combines cloud services with a powerful local <a href=\"https:\/\/www.eps-dc.com\/en\/serverraum-planung-beratung-errichtung\/\">IT infrastructure<\/a> is the only way to deliver our services with the necessary speed and reliability worldwide and, above all, around the clock,&#8221; explains Gerald Stiglitz, Managing Director of LAOLA1. <\/p><p>EPS implemented the project within twelve months, from the feasibility study to the successful overall functional test and handover. The result: a scalable and modular data center infrastructure that meets the strict requirements. A highlight of the project was the implementation of an <a href=\"https:\/\/www.eps-dc.com\/en\/aggregat-fuer-das-rechenzentrum\/\">IT emergency power generator<\/a> in a densely populated residential area. For this purpose, an innovative noise reduction and exhaust system technology has been developed to meet the requirements of a wide range of stakeholders.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b096aac e-con-full e-flex e-con e-child\" data-id=\"b096aac\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d236e6f elementor-widget elementor-widget-testimonial\" data-id=\"d236e6f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"We have been able to accompany LAOLA1 as a partner since 2010. With this data center project, we were once again able to demonstrate our competence in the planning and implementation of tailor-made IT infrastructures despite challenges. Particularly exciting was the implementation of a graded, normative protection zone concept within the existing structural conditions. In addition, we were able to ensure smooth implementation through close coordination with all those involved in the project.\"   \n<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Peter Reisinger, neuer Geschaeftsfuehrer von EPS\" width=\"700\" height=\"467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg\" class=\"attachment-medium size-medium wp-image-24574\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-700x467.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1080x720.jpg 1080w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-300x200.jpg 300w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-768x512.jpg 768w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-1536x1024.jpg 1536w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-2048x1366.jpg 2048w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/Karin_Ahamer_Photography-3265-600x400.jpg 600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\">Peter Reisinger<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\">Managing Director of EPS<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-237f2d4 e-flex e-con-boxed e-con e-parent\" data-id=\"237f2d4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6d87dcc elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"6d87dcc\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_14-1-1080x720.jpg\" alt=\"This is an IT emergency power generator with plant construction, which the company EPS planned and installed for LAOLA1\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1-1080x720.jpg\" alt=\"Gottfried Stoeger, Projektmanagement bei EPS, Peter Reisinger, Geschaeftsfuehrer von EPS,\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_1-1080x720.jpg\" alt=\"Peter Reisinger, Stefanie Gutleder, Erich Handschuh und Gerald Stiglitz im Gespraech.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_2-1-1080x720.jpg\" alt=\"Gottfried Stoeger (Firma EPS), Peter Reisinger (Firma EPS), Rainer Geier (LAOLA1), Stefanie Gutleder (EPS), Erich Handschuh (LAOLA1) und Gerald Stiglitz (LAOLA1)\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_3-1080x720.jpg\" alt=\"Peter Reisinger, Geschaeftsfuehrer von EPS, Gottfried Stoeger, Projektmanagement bei EPS,\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_4-1080x720.jpg\" alt=\"Rechenzentrum von EPS bei LAOLA1\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_5-1080x720.jpg\" alt=\"Gerald Stiglitz von LAOLA1, Erich Handschuh von LAOLA1, Peter Reisinger von EPS und Gottfried Stoeger von EPS stehen im Serverraum.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"8 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_6-1080x720.jpg\" alt=\"Erich Handschuh und Gerald Stiglitz von LAOLA1 gemeinsam mit Gottfried Stoeger und Peter Reisinger von EPS freuen sich \u00fcber den neu errichteten Serverraum.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"9 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_7-1080x720.jpg\" alt=\"Leckwarnsystem von EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"10 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_8-1080x720.jpg\" alt=\"TTK Leckage Warnsystem von EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"11 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_10-1080x720.jpg\" alt=\"Ein Serverraum, geplant und errichtet von EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"12 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_11-1080x720.jpg\" alt=\"EPS plant und errichtet Serverraum bei LAOLA1.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"13 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_12-1080x720.jpg\" alt=\"Sauerstoffreduktion\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"14 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_13-1080x720.jpg\" alt=\"IT-Klimaanlage von EPS fuer den Serverraum bei LAOLA1.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"15 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_15-1080x720.jpg\" alt=\"EPS baut IT-Klimatisierung im Rechenzentrum.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"16 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_16-1080x720.jpg\" alt=\"Erich Handschuh, IT-Leiter bei LAOLA1, und Peter Reisinger, Geschaeftsfuehrer von EPS, testen die USV-Anlage von Eaton im Serverraum.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"17 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_17-1080x720.jpg\" alt=\"IT-Verteiler von EPS im Serverraum bei LAOLA1.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"18 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_18-1080x720.jpg\" alt=\"Sichere Notstromversorgung mit einer Netzersatzanlage von EPS.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"19 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_19-1080x720.jpg\" alt=\"IT-Batterieraum von EPS fuer den Serverraum bei LAOLA1.\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"20 of 20\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Laola1_14-1-1080x720.jpg\" alt=\"This is an IT emergency power generator with plant construction, which the company EPS planned and installed for LAOLA1\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-82bbcde e-flex e-con-boxed e-con e-parent\" data-id=\"82bbcde\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-094f0ed e-con-full e-flex e-con e-child\" data-id=\"094f0ed\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-dca95b6 elementor-widget elementor-widget-text-editor\" data-id=\"dca95b6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Comprehensive complete solution from a single source<\/h3><p>Peter Reisinger, Managing Director of EPS, is proud: &#8220;We have been able to accompany LAOLA1 as a partner since 2010. With this data center project, we were once again able to demonstrate our competence in the planning and implementation of tailor-made IT infrastructures despite challenges. Particularly exciting was the implementation of a graded, normative protection zone concept within the existing structural conditions. In addition, we were able to ensure smooth implementation through close coordination with all those involved in the project.&#8221;   <\/p><p>The new data center infrastructure focuses on maximum efficiency and availability. A multi-path power supply system, modular <a href=\"https:\/\/www.eps-dc.com\/en\/kategorie\/power-supply-ups-systems-emergency-power-generators\/\">UPS systems<\/a> and hybrid data center air conditioning that has been seamlessly integrated into the existing building technology. The concept is rounded off by an innovative monitoring system that enables real-time monitoring of all critical parameters. In addition, the technical fire protection department was equipped with a fire prevention system developed and built in-house, which prevents a fire from occurring in the first place.   <\/p><p>Erich Handschuh, Senior Vice President Engineering at LAOLA1, emphasizes the importance of the solution: &#8220;Thanks to EPS&#8217;s expertise, we were able to implement an infrastructure that perfectly meets our requirements. The hybrid solution not only enables us to achieve stable performance, but also flexibility for future developments.&#8221; <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-78bd3f5 e-con-full e-flex e-con e-child\" data-id=\"78bd3f5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-455c142 e-con-full e-flex e-con e-child\" data-id=\"455c142\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-611dfd6 e-con-full e-flex e-con e-child\" data-id=\"611dfd6\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0c043a5 elementor-widget elementor-widget-heading\" data-id=\"0c043a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fc29bec elementor-widget elementor-widget-text-editor\" data-id=\"fc29bec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Planning &amp; Concept<ul><li>Requirements analysis<\/li><li>Feasibility study with site coordination<\/li><li>Creation of data center floor plan layouts and concepts<\/li><li>Plant and assembly planning<\/li><\/ul><\/li><li>Building construction<ul><li>Protection zone concept: IT whitespace, A+B UPSV\/NSHV rooms, A+B battery room &amp; emergency power machine room<\/li><li>IT raised floor<\/li><\/ul><\/li><li>Cooling &amp; Energy Supply<ul><li>IT air conditioning: Hybrid function with domestic cold water and internal redundant DX system, 2N<\/li><li>IT-RCS server racks with integrated cold\/hot aisle separation<\/li><li>IT emergency power generator with plant construction<\/li><li>IT UPS system: Modular and scalable, 150 kW power, 2N<\/li><li>IT UPS battery system: 10 minutes standby time, 2N<\/li><li>IT switchgear with UPS-EBS, emergency power switchover and RCM measurement, 2N<\/li><\/ul><\/li><li>Security &amp; Surveillance<ul><li>IT-technical fire protection: RAS detection &amp; technical fire prevention<\/li><li>IT leak warning system: digital comprehensive system for maximum protection<\/li><li>Monitoring &amp; fault alarm system: Real-time monitoring system with alarm<\/li><li>Power quality analysis according to EN50160<\/li><li>Energy measurement according to IEC 6000-4-30<\/li><\/ul><\/li><li>Commissioning &amp; Tests:<ul><li>Trial operation, load test and cross-trade overall function test<\/li><\/ul><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8bbb1e4 e-flex e-con-boxed e-con e-parent\" data-id=\"8bbb1e4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-dbca18b e-con-full e-flex e-con e-child\" data-id=\"dbca18b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-cf73fb0 e-con-full e-flex e-con e-child\" data-id=\"cf73fb0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-f7b8a27 e-con-full e-flex e-con e-child\" data-id=\"f7b8a27\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-a6c997e e-con-full e-flex e-con e-child\" data-id=\"a6c997e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f25c288 elementor-widget elementor-widget-text-editor\" data-id=\"f25c288\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3380432 elementor-widget elementor-widget-text-editor\" data-id=\"3380432\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the LAOLA1 Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-79bb04c elementor-widget elementor-widget-button\" data-id=\"79bb04c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/04\/EPS_Success_Story_Laola1_komprimiert.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bd91298 e-con-full e-flex e-con e-child\" data-id=\"bd91298\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e9272e8 e-con-full e-flex e-con e-child\" data-id=\"e9272e8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-14dbe51 elementor-widget elementor-widget-text-editor\" data-id=\"14dbe51\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c0a04e7 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"c0a04e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.ittbusiness.at\/article\/massgeschneiderte-rechenzentrumsinfrastruktur-fuer-LAOLA1\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IT&amp;T Business<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/05\/EPS_LAOLA1_Success_Story.pdf\" target=\"_blank\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">EHZ Austria  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Peter Reisinger, Managing Director of EPS, is proud: &#8220;We have been able to accompany LAOLA1 as a partner since 2010. With this data center project, we were once again able to demonstrate our competence in the planning and implementation of tailor-made IT infrastructures despite challenges. Particularly exciting was the implementation of a graded, normative protection zone concept within the existing structural conditions. In addition, we were able to ensure smooth implementation through close coordination with all those involved in the project.&#8221;   <\/p>\n","protected":false},"featured_media":28994,"template":"","class_list":["post-28997","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28997\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/28994"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=28997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":28954,"date":"2025-02-27T16:00:42","date_gmt":"2025-02-27T15:00:42","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/eps-usv-am-tpv-high-tech-campus-villach\/"},"modified":"2025-04-09T13:46:50","modified_gmt":"2025-04-09T11:46:50","slug":"eps-usv-am-tpv-high-tech-campus-villach","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/eps-usv-am-tpv-high-tech-campus-villach\/","title":{"rendered":"EPS ensures reliable energy supply at tpv Technology Park Villach|High Tech Campus Villach"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28954\" class=\"elementor elementor-28954 elementor-28891\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6e466d7 e-flex e-con-boxed e-con e-parent\" data-id=\"6e466d7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-461a711 e-con-full e-flex e-con e-child\" data-id=\"461a711\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3872ac9 elementor-widget elementor-widget-text-editor\" data-id=\"3872ac9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>An uninterruptible power supply (UPS) is essential for research and development facilities. At the High Tech Campus Villach, EPS Electric Power Systems has successfully installed two Borri UPS systems Ingenio MAX 200kVA\/200kW, each equipped with an external bypass switch and batteries. The UPS system was installed by the long-standing electrical engineering partner Elin and put into operation together with EPS. It ensures the highest level of operational continuity for one of Austria&#8217;s leading research institutions.   <\/em><\/p><p>Maria Anzbach \/ Villach &#8211; The High Tech Campus Villach (HTCV), a center for electronics, microelectronics and mechatronics, houses companies, start-ups and research institutes on an area of 9,000 square meters. Silicon Austria Labs, one of the main tenants, in particular, needs an absolutely reliable power supply for its cleanroom processes. A power outage could damage highly sensitive equipment or jeopardize valuable research results.  <\/p><p>&#8220;The requirements of our tenants are extremely demanding. Time-critical research projects and sensitive equipment require the highest level of security of supply. With the IT UPS systems from EPS, we have now found exactly the right solution and are taking an important step towards future-proofing. Our tenants benefit from the highest level of security of supply, and we can do even better justice to our role as an innovation center,&#8221; explains Bernhard Lamprecht, Managing Director of the High Tech Campus Villach.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a5abb04 e-con-full e-flex e-con e-child\" data-id=\"a5abb04\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;gradient&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e0a7281 elementor-widget elementor-widget-testimonial\" data-id=\"e0a7281\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"We are proud to be part of this important project. With Borri's Ingenio MAX systems, we have implemented a solution that meets the requirements for space and efficiency as well as maximum reliability.\" <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Peter Reisinger, Geschaeftsfuehrer von EPS\" width=\"700\" height=\"466\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min-700x466.jpg\" class=\"attachment-medium size-medium wp-image-24446\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min-700x466.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min-300x200.jpg 300w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min-768x512.jpg 768w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min-600x400.jpg 600w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2020\/02\/EPS_Peter_Reisinger_min.jpg 800w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\">Peter Reisinger  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/team\/peter-reisinger\/\">Managing Director of EPS  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ea7954d e-flex e-con-boxed e-con e-parent\" data-id=\"ea7954d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4dce859 elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"4dce859\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_11-1080x720.jpg\" alt=\"Irene Mondon-Stutterecker, Marketing at EPS, Francesco Masi, Marketing at Borri, and Barbara Orasche, Marketing HTC Campus Villach\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_3-1080x720.jpg\" alt=\"Luca Cappello von Borri with Bernhard Lamprecht and Stefan Rainer in front of the Borri Ingenio MAX UPS system\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_4-1080x720.jpg\" alt=\"Luca Cappello, J\u00fcrgen Stern, Bernhard Lamprecht and Stefan Rainer\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_5-1080x720.jpg\" alt=\"Stefan Rainer, Bernhard Lamprecht, J\u00fcrgen Stern in front of the Borri Ingenio MAX UPS system\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_10-1080x720.jpg\" alt=\"Luca Cappello stands in front of the Borri Ingenio MAX UPS system\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 of 6\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Borri_HTC_Villach_11-1080x720.jpg\" alt=\"Irene Mondon-Stutterecker, Marketing at EPS, Francesco Masi, Marketing at Borri, and Barbara Orasche, Marketing HTC Campus Villach\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8504136 e-flex e-con-boxed e-con e-parent\" data-id=\"8504136\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-26e1d38 e-con-full e-flex e-con e-child\" data-id=\"26e1d38\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5662ca8 elementor-widget elementor-widget-text-editor\" data-id=\"5662ca8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Efficient power supply for sensitive research<\/h3><p>The <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/ups-system-borri-ingenio-max-200kva-300kva\/\">Borri Ingenio MAX 200kVA\/200kW<\/a> IT-UPS systems supplied by EPS impress with their high energy efficiency, a low MTBF value (Mean Time Between Failure (MTBF), parallel capability, and their compact footprint. This enables space-saving and efficient integration into the existing infrastructure with the highest availability requirements. The two external bypass switches (EBS1250A-lock) ensure complete uninterrupted bypass of the UPS systems during maintenance work or UPS replacement, without affecting ongoing operations.  <\/p><p>&#8220;We are proud to be part of this important project. With the Ingenio MAX systems from Borri, we have implemented a solution that meets the requirements for space and efficiency as well as maximum reliability,&#8221; emphasizes Peter Reisinger, Managing Director and Sales Manager at EPS. &#8220;The cooperation with strong partners such as Elin and the Italian UPS manufacturer Borri underlines our claim to deliver the best solutions for our customers.&#8221;  <\/p><h3>Experience and expertise for seamless implementation<\/h3><p>The installation of the systems was carried out by the company Elin, which has been a partner of the tpv Technology Park Villach |HTCV is active in the field of electrical engineering. &#8220;The requirements in the buildings of the High Tech Campus Villach and its tenants were high, but together with EPS we were able to implement them successfully. EPS&#8217;s expertise and reliability made a significant contribution to ensuring that the project ran smoothly,&#8221; emphasizes J\u00fcrgen Stern, Site Manager Klagenfurt at Elin.  <\/p><p>The new UPS solution not only offers stability and efficiency, but also supports the High Tech Campus Villach in its role as a hub for technological innovation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e23393a e-con-full e-flex e-con e-child\" data-id=\"e23393a\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-d4c6ccb e-con-full e-flex e-con e-child\" data-id=\"d4c6ccb\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-38a7af2 elementor-widget elementor-widget-heading\" data-id=\"38a7af2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-874363e elementor-widget elementor-widget-text-editor\" data-id=\"874363e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>2 pieces of IT UPS systems Borri Ingenio Max 200kVA \/ 200kW<\/li><li>2 pieces of external IT-UPS GTC battery systems (99.99% pure lead) equipped with ESS technology<\/li><li>EPS EBS 1250A-G External Bypass Switch with UPS Sync Interface for Uninterruptible UPS Bypass<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-51bce4a e-flex e-con-boxed e-con e-parent\" data-id=\"51bce4a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-885dc80 e-con-full e-flex e-con e-child\" data-id=\"885dc80\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-f9385ec e-con-full e-flex e-con e-child\" data-id=\"f9385ec\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-72c6dbb e-con-full e-flex e-con e-child\" data-id=\"72c6dbb\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f130b5c elementor-widget elementor-widget-text-editor\" data-id=\"f130b5c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6130476 elementor-widget elementor-widget-text-editor\" data-id=\"6130476\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the High Tech Campus Villach Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-46d9654 elementor-widget elementor-widget-button\" data-id=\"46d9654\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_HTC_Villach_Pressemeldung_2025.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-13768b6 e-con-full e-flex e-con e-child\" data-id=\"13768b6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-52f9590 e-con-full e-flex e-con e-child\" data-id=\"52f9590\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-724de27 elementor-widget elementor-widget-text-editor\" data-id=\"724de27\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tIn the media\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fcd0267 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"fcd0267\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.noen.at\/neulengbach\/auftrag-in-kaernten-sichere-stromversorgung-von-eps-maria-anzbach-fuer-technologiepark-464455258\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">N\u00d6N Neulengbach  <\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/elektropraxis.at\/energieversorgung\/usv-fuer-sensible-forschungsbereiche\/\" target=\"_blank\" rel=\"noopener\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Electrical Practice<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>An uninterruptible power supply (UPS) is essential for research and development facilities. At the High Tech Campus Villach, EPS Electric Power Systems has successfully installed two Borri UPS systems Ingenio MAX 200kVA\/200kW, each equipped with an external bypass switch and batteries. The UPS system was installed by the long-standing electrical engineering partner Elin and put into operation together with EPS. It ensures the highest level of operational continuity for one of Austria&#8217;s leading research institutions.   <\/p>\n","protected":false},"featured_media":28897,"template":"","class_list":["post-28954","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28954\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/28897"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=28954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":28472,"date":"2025-01-08T13:12:42","date_gmt":"2025-01-08T12:12:42","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/eps-rechenzentrum-infrastruktur-sichert-die-stromversorgung-im-seniorenheim-neandertal\/"},"modified":"2026-01-16T10:17:49","modified_gmt":"2026-01-16T09:17:49","slug":"eps-sichert-stromversorgung-im-neandertal","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/eps-sichert-stromversorgung-im-neandertal\/","title":{"rendered":"EPS data center infrastructure secures the power supply in the Neandertal retirement home"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28472\" class=\"elementor elementor-28472 elementor-28450\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c5abbd0 e-flex e-con-boxed e-con e-parent\" data-id=\"c5abbd0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-943587a e-con-full e-flex e-con e-child\" data-id=\"943587a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f7f4342 elementor-widget elementor-widget-text-editor\" data-id=\"f7f4342\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Extraordinary weather events are no longer uncommon in Germany. This has prompted the administration of the retirement home in Mettmann to revise the emergency plans of the home and to purchase an <a href=\"https:\/\/www.eps-dc.com\/en\/aggregat-fuer-betriebe\/\">emergency power supply<\/a> in the form of a generator. Marwin Bremkamp, administrative manager at the facility for over 20 years, is responsible for accounting. Due to his technical affinity, he also provides support with technical matters. When he was looking for an emergency power device on the Internet, he came across the family-owned company EPS Rechenzentrum Infrastruktur GmbH from Straubing, Bavaria.    <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-21d8e7f e-con-full e-flex e-con e-child\" data-id=\"21d8e7f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68af3f7 elementor-widget elementor-widget-testimonial\" data-id=\"68af3f7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"We thank you for the trust. From the very beginning, the cooperation was on an equal footing, and both sides were taken seriously. Communication was smooth and fast.\"  <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/team\/diana-engel\/\"><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2023\/05\/Karin_Ahamer_Photography-2209.jpg\" title=\"\" alt=\"EPS-DE-Diana-Engel-Vertrieb\" loading=\"lazy\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/team\/diana-engel\/\">Diana Engel<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/team\/diana-engel\/\">Sales &amp; Authorized Signatory at EPS  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-71f733b e-flex e-con-boxed e-con e-parent\" data-id=\"71f733b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-16fcfab elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"16fcfab\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 2\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/01\/IMG_20240410_124347-1080x810.jpg\" alt=\"Neandertal retirement home with emergency generator from EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 2\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/01\/IMG_20240410_124347-1080x810.jpg\" alt=\"Neandertal retirement home with emergency generator from EPS\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ad8fd42 e-flex e-con-boxed e-con e-parent\" data-id=\"ad8fd42\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-6aa59d7 e-con-full e-flex e-con e-child\" data-id=\"6aa59d7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1e2fe2b elementor-widget elementor-widget-text-editor\" data-id=\"1e2fe2b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Purchase of the emergency power generator<\/h3><p>Weather phenomena in Germany, such as the floods in the Ahr Valley in 2021, have highlighted the vulnerability of the infrastructure. The nursing home is surrounded by two small streams that swell during heavy rain and flooded the heating system in 2021. These events, but also the development of general emergency concepts (such as for power failures), made the management team of the Neandertal retirement home aware that the facility must be prepared in the best possible way for such emergencies. A funding program specifically for retirement homes and hospitals also helped to make the decision.   <\/p><h3>Implementation challenges<\/h3><p>One of the biggest challenges was the lack of knowledge about how to handle an <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/diesel-stromerzeuger-100kva-80kw\/\">emergency generator<\/a>. The support of a specialist planner was crucial. As a state-certified electrical engineer, he was able to support the decision with his knowledge in the field of electrics and fire protection.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8eff91e e-con-full e-flex e-con e-child\" data-id=\"8eff91e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-005e382 elementor-widget elementor-widget-text-editor\" data-id=\"005e382\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>EPS as an industry-experienced provider<\/h3><p>Marwin Bremkamp: &#8220;The care facility was looking for an emergency power device with suitable capacity and good value for money. EPS&#8217;s offer was convincing due to its quality and transparency. The detailed documentation was helpful in having all the relevant information.&#8221; There were many offers, but in the end the nursing home decided in favor of EPS based on the expertise of a specialist planner.<\/p><h3>The EPS Team<\/h3><p>The EPS team was very open and helpful. The training during commissioning was comprehensive, and the technician patiently answered all questions. At EPS, transparency and customer service are very important.  <\/p><p>&#8220;We thank you for the trust. From the very beginning, the cooperation was on an equal footing, and both sides were taken seriously. The communication was smooth and fast,&#8221; emphasizes Diana Engel, project manager at EPS.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-369c544 e-flex e-con-boxed e-con e-parent\" data-id=\"369c544\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-f8608d0 e-con-full e-flex e-con e-child\" data-id=\"f8608d0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-2624995 e-con-full e-flex e-con e-child\" data-id=\"2624995\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-b34d2e7 e-con-full e-flex e-con e-child\" data-id=\"b34d2e7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-7c02445 e-con-full e-flex e-con e-child\" data-id=\"7c02445\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-91949dc e-con-full e-flex e-con e-child\" data-id=\"91949dc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c32bebe elementor-widget elementor-widget-text-editor\" data-id=\"c32bebe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-48e20f4 elementor-widget elementor-widget-text-editor\" data-id=\"48e20f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the Advent Welfare Neandertal Retirement Home Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-81878c9 elementor-widget elementor-widget-button\" data-id=\"81878c9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/01\/FB_31-06_EPS_Pressemitteilung_Advent_Wohlfahrt_Neandertal.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-997c9c7 e-con-full e-flex e-con e-child\" data-id=\"997c9c7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Extraordinary weather events are no longer uncommon in Germany. This has prompted the administration of the retirement home in Mettmann to revise the emergency plans of the home and to purchase an emergency power supply in the form of a generator. Marwin Bremkamp, administrative manager at the facility for over 20 years, is responsible for [&hellip;]<\/p>\n","protected":false},"featured_media":28459,"template":"","class_list":["post-28472","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28472\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/28459"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=28472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":28126,"date":"2024-12-05T11:39:46","date_gmt":"2024-12-05T10:39:46","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/notstromaggregat-volksbank-weiden\/"},"modified":"2026-02-03T13:02:22","modified_gmt":"2026-02-03T12:02:22","slug":"notstromaggregat-volksbank-weiden","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/notstromaggregat-volksbank-weiden\/","title":{"rendered":"EPS supplies Volksbank Raiffeisenbank Nordoberpfalz eG with new emergency power generator"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"28126\" class=\"elementor elementor-28126 elementor-28071\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-76bf83f e-flex e-con-boxed e-con e-parent\" data-id=\"76bf83f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-1473e89 e-con-full e-flex e-con e-child\" data-id=\"1473e89\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-749a9a1 elementor-widget elementor-widget-text-editor\" data-id=\"749a9a1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Germany is generally considered a country with a stable electricity supply. Nevertheless, there can also be longer power outages in this country, for which not only the critical infrastructure must be prepared accordingly. Volksbank Raiffeisenbank Nordoberpfalz eG, one of the largest financial institutions in the Upper Palatinate with 40 locations throughout Germany, also decided to upgrade its IT infrastructure to higher security standards out of a sense of duty to its customers.  <\/p><p>Straubing\/Weiden, December 3, 2024 \u2013 &#8220;Due to advancing digitalization and increasingly frequent power outages, it was important to us to secure sensitive customer data even better. That&#8217;s why we were looking for an emergency power generator with autonomous switch-on and switch-off times around the clock,&#8221; explains Peter Rupprecht, IT administrator and project manager in IT management at VR-Nopf. After extensive research, Volksbank&#8217;s IT manager finally decided on EPS Electric Power Systems and a <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/diesel-notstromaggregat-j66c3-60kva-48kw\/\">60 kVA emergency power generator<\/a> with supply and exhaust air systems, an exhaust system and a tailor-made energy distribution.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a1947f3 e-con-full e-flex e-con e-child\" data-id=\"a1947f3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d456ef0 elementor-widget elementor-widget-testimonial\" data-id=\"d456ef0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"Both teams were on the same line from the start. Punctuality, reliability and technical skills were brought to the table by both sides, so that the demanding project could be completed on time.\"  <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/en\/team\/markus-jaehrig\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Markus Jaehrig, Vertrieb Innendienst bei EPS Rechenzentrum Infrastruktur GmbH.\" width=\"395\" height=\"386\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/10\/EPS_Markus_Jaehrig-1.jpg\" class=\"attachment-medium size-medium wp-image-29776\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/10\/EPS_Markus_Jaehrig-1.jpg 395w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/10\/EPS_Markus_Jaehrig-1-300x293.jpg 300w\" sizes=\"(max-width: 395px) 100vw, 395px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/en\/team\/markus-jaehrig\/\">Markus Jahrig  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/en\/team\/markus-jaehrig\/\">Sales at EPS  <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cc01b99 e-flex e-con-boxed e-con e-parent\" data-id=\"cc01b99\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6904aee elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"6904aee\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 5\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/EPS_Volksbank_Weiden-1080x720.jpg\" alt=\"Diana Engel from EPS Rechenzentrum Infrastruktur with Bruno Durst Volksbank Raffeisenbank Nordoberpfalz in front of the emergency power generator\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 5\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/EPS_Volksbank_Weiden_2-1080x720.jpg\" alt=\"Diana Engel after the installation of the emergency power generator for the Volksbank Raiffeisenbank Nordoberpfalz eG\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 5\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/EPS_Volksbank_Weiden_3-1080x720.jpg\" alt=\"Peter Rupprecht, IT administrator and project manager in IT management at Volksbank Raiffeisenbank Nordoberpfalz eG with colleague Bruno Durst in front of the emergency power generator of the company EPS\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 of 5\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/EPS_Volksbank_Weiden_5-1080x720.jpg\" alt=\"EPS Data Center Infastruktur supplies Voksbank Raiffeisenbank Nordoberpfalz with new emergency power generator\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 of 5\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/EPS_Volksbank_Weiden_9-1080x720.jpg\" alt=\"Bruno Durst, responsible for building technology and technical project management at Volksbank Raiffeisenbank Nordoberpfalz eG, stands in front of an open emergency power generator\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6eaac76 e-flex e-con-boxed e-con e-parent\" data-id=\"6eaac76\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-1704d09 e-con-full e-flex e-con e-child\" data-id=\"1704d09\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68533f3 elementor-widget elementor-widget-text-editor\" data-id=\"68533f3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Complete solution with local service team<\/h3><p>Bruno Durst, responsible for building technology and technical project management at Volksbank Raiffeisenbank Nordoberpfalz eG, emphasizes the high requirements that the bank placed on an emergency power system: &#8220;A zero-eight-fifteen solution was out of the question for us due to the structural conditions alone. We were looking for a reliable company with complete solutions for emergency power systems that would meet our strict local specifications and technical requirements.&#8221; The length of the outer exhaust system, which was made of a single 20-metre pipe due to the local conditions, is remarkable. This solution prevents windows from being covered and ensures the necessary stability due to the reduced number of attachment points on the house fa\u00e7ade. The exhaust system was mounted on the fa\u00e7ade only once, which brought both aesthetic and structural advantages.<\/p><p>The <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/zu-abluftanlage-fuer-notstromaggregat\/\">supply and exhaust air systems<\/a> were designed with a focus on a harmonious appearance, with the supply air being larger than the exhaust air due to technical specifications. Both systems are also vandal-proof, which ensures the long-term protection and operation of the system.<\/p><p>The emergency power generator itself was housed in a specially separated area of the underground car park. This solution not only enables optimal protection of the system, but also safe integration into the existing building. Particular attention was paid to the statics, as the attachment of the exhaust system to the ceiling of the underground car park posed special requirements.  <\/p><p>The regional proximity of the project partner was also important for VR-Nopf, especially for service and maintenance work. Here, the server room specialist impressed with its location in Straubing (Bavaria). A total of one year passed from the first conversation to the implementation of the solution. The collegial and professional cooperation with the entire team of technicians at Volksbank Raiffeisenbank Nordoberpfalz eG should be underlined here: &#8220;Both teams were on the same page from the very beginning. Punctuality, reliability and technical skills were brought to the table by both sides, so that the demanding project could be completed on time.&#8221;    <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e3f7634 e-con-full e-flex e-con e-child\" data-id=\"e3f7634\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bed4602 elementor-widget elementor-widget-heading\" data-id=\"bed4602\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The project scope in detail<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-47053ef elementor-widget elementor-widget-text-editor\" data-id=\"47053ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Emergency power generator 60kVA<\/li><li>Power distribution with, among other things, a high-performance changeover system 160A for automatic control of the emergency power generator and constant monitoring<\/li><li>Supply and exhaust air system<\/li><li>Exhaust gas routing<\/li><li>Basic maintenance with annual preventive maintenance<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-cecbfcf e-flex e-con-boxed e-con e-parent\" data-id=\"cecbfcf\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-6325c6a e-con-full e-flex e-con e-child\" data-id=\"6325c6a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-5a4cfc0 e-con-full e-flex e-con e-child\" data-id=\"5a4cfc0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-59b4daa e-con-full e-flex e-con e-child\" data-id=\"59b4daa\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-f20965c e-con-full e-flex e-con e-child\" data-id=\"f20965c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4e1ea3e elementor-widget elementor-widget-text-editor\" data-id=\"4e1ea3e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-39ed10e elementor-widget elementor-widget-text-editor\" data-id=\"39ed10e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the Volksbank Raiffeisenbank Nordoberpfalz eG Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df92357 elementor-widget elementor-widget-button\" data-id=\"df92357\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/12\/FB_31-06_EPS_Pressemitteilung_Volksbank_Weiden_komprimiert.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-175e7a9 e-con-full e-flex e-con e-child\" data-id=\"175e7a9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4f998ea e-flex e-con-boxed e-con e-parent\" data-id=\"4f998ea\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>&#8220;Due to advancing digitalization and increasingly frequent power outages, it was important to us to secure sensitive customer data even better. That&#8217;s why we were looking for an emergency power generator with autonomous switch-on and switch-off times around the clock,&#8221; explains Peter Rupprecht, IT administrator and project manager in IT management at Volksbank Raiffeisenbank Nordoberpfalz eG. <\/p>\n","protected":false},"featured_media":28082,"template":"","class_list":["post-28126","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/28126\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/28082"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=28126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":27973,"date":"2024-11-20T14:10:17","date_gmt":"2024-11-20T13:10:17","guid":{"rendered":"https:\/\/www.eps-dc.com\/referenz\/eps-sorgt-fuer-sichere-stromversorgung-in-steyr\/"},"modified":"2025-04-28T14:58:45","modified_gmt":"2025-04-28T12:58:45","slug":"eps-sorgt-sichere-stromversorgung-steyr","status":"publish","type":"reference","link":"https:\/\/www.eps-dc.com\/en\/referenz\/eps-sorgt-sichere-stromversorgung-steyr\/","title":{"rendered":"EPS ensures secure power supply in Steyr"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"27973\" class=\"elementor elementor-27973 elementor-26756\" data-elementor-post-type=\"reference\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5856e14 e-flex e-con-boxed e-con e-parent\" data-id=\"5856e14\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-6636786 e-con-full e-flex e-con e-child\" data-id=\"6636786\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e0da50c elementor-widget elementor-widget-text-editor\" data-id=\"e0da50c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Maria Anzbach \/ Steyr &#8211; At a time when awareness of the importance of an uninterruptible power supply is increasing, many institutions and companies are faced with the challenge of preparing for possible power outages. This is especially true for the city of Steyr, which wanted to ensure a reliable emergency power supply as part of its blackout prevention plans. The Lower Austrian family-owned company EPS Electric Power Systems was commissioned with the project, which equipped the municipal utilities with a new emergency power generator.  <\/p><p>City Councillor Mag. Katrin Auer: &#8220;Blackout prevention is an important concern for the city of Steyr. The city administration itself is very committed to this area and contributes extensive personal knowledge. I am all the more pleased that we have found a competent partner in EPS who will help us with innovative solutions to secure the infrastructure of our city even better.&#8221;   <\/p><p>Mag. Peter Hochgatterer, Managing Director of Stadtbetriebe Steyr, is also pleased to have found a reliable partner from the region in EPS: &#8220;Our motto is &#8216;Preparedness for emergencies&#8217;. With the successful implementation of the emergency power generator, the city of Steyr is taking an important step towards a secure and sustainable power supply.&#8221;  <\/p><ul><li> <\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2acb56c e-con-full e-flex e-con e-child\" data-id=\"2acb56c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5ca620f elementor-widget elementor-widget-testimonial\" data-id=\"5ca620f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">\"The project is a prime example of how well-thought-out planning, regional cooperation and technical innovation can contribute to greater safety and sustainability in public institutions.\"  <\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/team\/verena-broederbauer\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Verena Broederbauer Vertrieb EPS Electric Power Systems\" width=\"700\" height=\"467\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2021\/07\/EPS_Verena_Broederbauer_Vertrieb.jpg\" class=\"attachment-medium size-medium wp-image-18915\" srcset=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2021\/07\/EPS_Verena_Broederbauer_Vertrieb.jpg 700w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2021\/07\/EPS_Verena_Broederbauer_Vertrieb-600x400.jpg 600w, https:\/\/www.eps-dc.com\/wp-content\/uploads\/2021\/07\/EPS_Verena_Broederbauer_Vertrieb-300x200.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-name\" href=\"https:\/\/www.eps-dc.com\/team\/verena-broederbauer\/\">Verena Br\u00f6derbauer<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-testimonial-job\" href=\"https:\/\/www.eps-dc.com\/team\/verena-broederbauer\/\">Project Manager at EPS<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b2b2f0e e-flex e-con-boxed e-con e-parent\" data-id=\"b2b2f0e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ba82b5e elementor-arrows-position-inside elementor-pagination-position-outside elementor-widget elementor-widget-image-carousel\" data-id=\"ba82b5e\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;slides_to_show&quot;:&quot;1&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;autoplay&quot;:&quot;yes&quot;,&quot;pause_on_hover&quot;:&quot;yes&quot;,&quot;pause_on_interaction&quot;:&quot;yes&quot;,&quot;autoplay_speed&quot;:5000,&quot;infinite&quot;:&quot;yes&quot;,&quot;effect&quot;:&quot;slide&quot;,&quot;speed&quot;:500}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image Carousel\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper\" aria-live=\"off\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 of 3\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/EPS_Stadtbetriebe_Steyr_2-1080x720.jpg\" alt=\"EPS KOHLER emergency power generator locked is at Stadtbetriebe Steyr\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 of 3\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/EPS_Stadtbetriebe_Steyr_1-1080x720.jpg\" alt=\"EPS emergency power generator from KOHLER stands on the premises of the Steyr municipal utilities\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 of 3\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" alt=\"\" class=\"swiper-slide-image\" src=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/EPS_Stadtbetriebe_Steyr_2-1080x720.jpg\" alt=\"EPS KOHLER emergency power generator locked is at Stadtbetriebe Steyr\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-left\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"eicon-chevron-right\"><\/i>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-50cc6db e-flex e-con-boxed e-con e-parent\" data-id=\"50cc6db\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-3266fc4 e-con-full e-flex e-con e-child\" data-id=\"3266fc4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-769adbb elementor-widget elementor-widget-text-editor\" data-id=\"769adbb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>Grid-parallel emergency power generator<\/h3><p>The implementation of the project required a genset that could be used not only in emergency power operation, but also in parallel with the grid \u2013 a combination that was so difficult to find. &#8220;EPS was the only company that was able to offer us a grid-parallel solution in emergency power operation and also maintains it,&#8221; explains Ing. Roland Raab, environmental manager of Stadtbetriebe Steyr. The decision was made in favor <a href=\"https:\/\/www.eps-dc.com\/en\/produkt\/diesel-notstromaggregat-j66c3-60kva-48kw\/\">of a J66C3 diesel emergency power generator<\/a> with the APM403P control system. The emergency power generator switches on at about 20 to 30 percent of the storage capacity. If the PV system is too weak, the generator can be automatically switched on. A special feature is its HVO suitability. HVO, a synthetic diesel made from biological components, is known for its long shelf life and environmentally friendly properties.       <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bbcc539 e-con-full e-flex e-con e-child\" data-id=\"bbcc539\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2f40b58 elementor-widget elementor-widget-text-editor\" data-id=\"2f40b58\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3>EPS \u2013 a strong partner in Austria<strong><br><\/strong><\/h3><p>The first contact was made in the summer of 2023, and the successful commissioning took place in spring 2024. &#8220;The process was very efficient and uncomplicated,&#8221; explains Verena Br\u00f6derbauer, project manager at EPS.  &#8220;The project is a prime example of how well-thought-out planning, regional cooperation and technical innovation can contribute to greater safety and sustainability in public institutions.&#8221;<\/p><p>The technical details:<\/p><ul><li>Diesel Emergency Power Generator 60kVA \/ 48kW<\/li><li>Control with synchronization<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-aa267b2 e-flex e-con-boxed e-con e-parent\" data-id=\"aa267b2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-016a424 e-con-full e-flex e-con e-child\" data-id=\"016a424\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-b5a23f6 e-con-full e-flex e-con e-child\" data-id=\"b5a23f6\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-9e80d0b e-con-full e-flex e-con e-child\" data-id=\"9e80d0b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b13b45f elementor-widget elementor-widget-text-editor\" data-id=\"b13b45f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-55e9b67 elementor-widget elementor-widget-text-editor\" data-id=\"55e9b67\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Download the Stadtbetriebe Steyr Success Story as a PDF.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a5b64cf elementor-widget elementor-widget-button\" data-id=\"a5b64cf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2024\/11\/EPS_Pressemitteilung_Stadtbetriebe_Steyr.pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-angle-right\"><\/i>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Download PDF<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8c9585e e-con-full e-flex e-con e-child\" data-id=\"8c9585e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-67f21f0 e-con-full e-flex e-con e-child\" data-id=\"67f21f0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-971e7ef elementor-widget elementor-widget-text-editor\" data-id=\"971e7ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h5><strong>Published on<\/strong><\/h5>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e0e73d7 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"e0e73d7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.eps-dc.com\/wp-content\/uploads\/2025\/02\/EPS_Stadtbetriebe_Steyr_i_magazin_01_2025.pdf\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-chevron-right\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">i-Magazine<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>At a time when awareness of the importance of an uninterruptible power supply is increasing, many institutions and companies are faced with the challenge of preparing for possible power outages. This is especially true for the city of Steyr, which wanted to ensure a reliable emergency power supply as part of its blackout prevention plans. The Lower Austrian family-owned company EPS Electric Power Systems was commissioned with the project, which equipped the municipal utilities with a new emergency power generator.  <\/p>\n","protected":false},"featured_media":26767,"template":"","class_list":["post-27973","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/27973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":0,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/reference\/27973\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media\/26767"}],"wp:attachment":[{"href":"https:\/\/www.eps-dc.com\/en\/wp-json\/wp\/v2\/media?parent=27973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}]