Emergency generator as power supply in the data center

An emergency power generator as an additional power supply for the data center offers a number of advantages that have a significant impact on the continuity of server room operations and the security of the IT infrastructure and data. As an expert in data center infrastructures and aggregates, you benefit from our many years of experience in this field.

Diesel emergency generator R110C5 from REHLKO, available from EPS Electric Power Systems GmbH.

Power supply with maximum availability for your server room

Data center and genset - the important combination

  • Individual power supply solution for the data center: Depending on the dimensions and requirements, we plan and install the equipment for your emergency power generator for the server room. The type of control and definition of communication between the UPS system and the genset are particularly important for efficient server room operation.

  • Stationary or mobile unit: Whether for stationary or mobile use, we offer both variants for you. Mobile systems are delivered by us with a trailer and are ideal for server room relocations or short-term applications.

  • Uninterrupted operation of the data center: To ensure that the operation of your server room runs smoothly, we also offer any maintenance or service work by our EPS service team on Sundays and public holidays, or outside normal business hours, by appointment.

  • Power units with quality: We rely on products with CE certification and work together with well-known manufacturers. Here we rely on existing and long-standing partnerships. All units installed by EPS may also be operated with HV0 diesel.

The complete emergency power solution from EPS: We take over for you

  • Planning and positioning of the unit
  • Ventilation calculation and dimensioning of the flue gas system
  • Integration into existing systems or systems with external controls (e.g. UPS systems)
  • Determination of communication between emergency power generator and UPS system for highly efficient server room operation
  • Definition of the communication interfaces for all common BUS connections
  • Visualization of the entire supply system via a central display with status indicators and graphical overview of the complete system
  • Installation of the power supply in accordance with valid and required standards
    • Austria: ÖVE ÖNORM E8007, ÖVE ÖNORM E8002, ÖVE ÖNORM E8101
    • Germany: Compliance with the applicable DIN standards
    • Switzerland: Compliance with applicable standards
  • Creation of foundation and power plans
  • Integration of the mains and system protection (NA protective device) for gensets over 30 kW output
  • Integration of an automatic lubricating oil refill and a diesel fuel cleaning system to prevent fuel contamination, e.g. diesel plague
  • PV communication interface on the emergency power generator with integration into the complete system
  • Communication cables in fiber optic design and redundant ring topology
  • Installation of mobile feed-in points as redundancy for the existing emergency power system
  • Compliance with all provisions of the Combustion Systems Ordinance 2019 – FAV 2019
  • In the case of mobile units, we take care of the type approval of the system for road approval for you

To keep your data center running:
Our service for the genset in the server room

Our own service team is continuously trained in the area of power supply and takes care of the entire process. Thanks to our experience in the data center and power supply sector, we can apply our know-how in a targeted manner and benefit from it:

  • In-house EPS service team with many years of experience in data centers, IT and server rooms with and without emergency power generators
  • Regular exhaust and load tests
  • Checking and replacing the fuel
  • Service and maintenance of the unit in vers. Implementation options: Preventive maintenance through to managed service for the entire data center
  • EPS service hotline: 24/7 availability of an EPS service technician and deployment in the event of a fault for the entire server room or just for the unit
EPS equips Biomay with emergency power supply

Top Products

We recommend emergency power generators from the manufacturer KOHLER, which stands for the highest quality in the field of emergency power supply.

Accessories for your emergency power generator for even higher availability in the server room

Benefit from our expertise

25

Years of experience

384

Aggregate Projects

50

Colleague

300+

satisfied customers in the
Domestic and international

We are happy to support you in the planning and implementation of your genset project!

Rent
or
Purchase

Here you can see an emergency power generator of the company KOHLER in a parking lot in front of a glass building

Flexible financing of your genset with EPS

You can flexibly rent or lease any unit from us. This allows you to avoid investment costs and temporarily limit the use of your unit in the IT room. This is suitable, for example, when relocating the data center or when bridging maintenance times in certain construction phases.

References

EPS-Nessus-Colocation-Rechenzentrum-Wien
Logo Nessus

Nessus and EPS have jointly built a second state-of-the-art data center in Vienna to meet growing customer needs. Despite challenges such as integration into an existing building and ensuring redundancy, the project was successfully completed. The new center offers expanded capacities and site redundancy for even greater reliability.

Data Center Emergency Power Generators: Planning, Standards and Operation

Dimensioning, legal requirements and maintenance: The most important questions about the installation of power generators for critical IT infrastructure.

Dimensioning of emergency power systems

When analyzing which types of emergency power generators and power generators are best suited for the critical IT infrastructure and how to calculate the required power, transient load changes are the central design criterion.

For data centers, low-speed diesel generators or modern HVO-capable (Hydrotreated Vegetable Oil) systems are mainly used, as they have excellent load transfer characteristics.

In addition to the pure IT load, the calculation of the apparent power (kVA) must also take into account the starting currents of the mechanical chillers, the charging capacity of the UPS systems and generous redundancy reserves. Each specialist planner takes into account the interaction of reactive and active power in order to prevent frequency drops when the generator is switched on.

Before installation, it is imperative to check which legal requirements and guidelines must be observed when installing new power generators for IT emergency power in Germany and which engineering offices will take over the official approval planning. Relevant standards such as the 44th BImSchV (Federal Immission Control Ordinance) regulate strict limits for exhaust gas and noise emissions.

In addition, water law requirements according to AwSV for the double-walled fuel tanks and the specifications of VDE-AR-N 4110 for grid-parallel operation must be strictly adhered to. Specialized planning offices prepare the complex noise assessments, dispersion calculations for exhaust gases and accompany the entire approval process up to the official final acceptance.

Finally, operators are faced with the question of where to find experienced service providers for manufacturer-independent planning, turnkey construction and subsequent maintenance of emergency power generators for business-critical server rooms. Reliability depends largely on clean system integration and regular load runs.

We offer you exactly this end-to-end support, from the first concept study to the 24/7 service level agreement. Every project manager in our company coordinates all trades to minimize interface losses. Let’s plan your IT emergency power supply together and contact us for a highly available infrastructure.

If you have any questions about our services , please do not hesitate to contact us.

Your contact person

Markus
Jährig
Technical Internal Sales
E:

Your contact person

Ing.
Michael
Stern
Sales Export & IT, Authorized Signatory DE
E:

Your contact person

Ing.
Michael
Stern
Sales Export & IT, Authorized Signatory DE
E:
Login

|

Show content for your country?

Select a different country to see content for your location:

Virtual 3D tour of emergency power generator

Register here and take a look with us at a data center that has a 1000kVA/800kW PRP (Prime Power) with MTU 16V2000DS1100 diesel engine emergency power supply.

We use cookies and similar technologies. Functional cookies are always active in order for this website to function as intended. Statistics and marketing cookies are only set after you have consented. You can use the buttons below to allow or reject each category individually and then click “Save selection” or accept or reject everything with one click. You can change or revoke your selection at any time on the cookie page .

🍪 Accept cookies?

Cookies make it possible to control campaigns and optimize the website. By clicking “Accept”, you agree to the use of all cookies and enter the website. Read more in the privacy policy.

Forgot Password
Forgot Password