EPS data center for SAN Group. You can see from left to right: Rudolf Beranek, IT Specialist (SAN Grroup), Andreas Hahn, Head of Information Technology (SAN Group). Peter Reisinger (Sales Manager EPS), Stefanie Gutleder (Managing Director EPS)

Geo-redundant data center solution for SAN Group

Maria-Anzbach/Herzogenburg – New construction of company headquarters is a cost- and time-consuming challenge in many respects. For the SAN Group’s new corporate location in Herzogenburg, Lower Austria, the globally active biotechnology company needed a fail-safe and sustainable IT and data center infrastructure that efficiently supplies the local company headquarters and all other locations.

The server room professional EPS Electric Power Systems was entrusted with this challenging project. The two companies are thus continuing a successful cooperation, as the SAN Group has already been able to convince in the past with its expertise and long-lasting complete data center solutions.

“EPS planned and built two identical and geo-redundant data centers, which, in addition to a hybrid cloud solution, ensure maximum availability even if one of the two data centers fails,” explains Andreas Hahn, Head of IT at SAN Group, adding: “Our hybrid solution offers us a lot of flexibility, optimizes costs and latencies, and increases our data security.”

"Through close coordination between all project participants, precise plant and assembly planning and the use of innovative components, we were able to create a sustainable solution with high availability for SAN Group."
Peter Reisinger, Geschaeftsfuehrer von EPS
Peter Reisinger
Sales Manager at EPS

Two data centers – maximum flexibility

The implementation of the two server rooms took place in 2 stages. First, the data center was built in the industrial building, then the one in the main building, which was completed in autumn 2023. Close coordination with the responsible architects and specialist planners was required here, as a server room was to be positioned centrally in the office building. A comprehensive protection zone concept, which includes a separate UPS room and technical room, has been developed. Redundant Eaton 93PS IT-UPS systems were installed at each site, with batteries housed in a separate room to ensure room conditions and safety requirements in accordance with current standards and business continuity. Other safety features such as an early fire detection system, a higher-level alarm and monitoring system and a digital leak warning system were also implemented. “Thanks to close coordination between all project participants, precise plant and assembly planning and the use of innovative components, we were able to create a sustainable solution with high availability for SAN Group,” explains Peter Reisinger, Sales Manager at EPS.

Sustainability thanks to innovative server room cooling

The ecological cooling of the two server rooms should be emphasized. At its company site, SAN Group uses natural groundwater sources,

which are obtained through deep drilling instead of resorting to environmentally harmful refrigerants. This methodology supports SAN Group’s ambition to be carbon neutral by 2027.

The project scope in detail

  • Feasibility study and data center design
  • IT raised floor system
  • IT Cable Management and Management System for Structured Fiber Optic & CU Data Cabling
  • IT-RCS server racks with adjustable cold air supply and integrated cold and hot aisle separation
  • Sustainable and ecological IT air conditioning with groundwater
  • Modular and scalable IT UPS system 93hp with 20kW power
  • IT monitoring system / fault detection system and real-time monitoring system
  • IT security technology with early fire detection
  • Project planning with plant and assembly planning

Download

Download the SAN Group Success Story as a PDF.

In the media

More projects and great references

Paul Muehlbächler, IT Services at HABAU GROUP, Gerald Froschauer, IT Manager at HABAU GROUP, Peter Reisinger, Managing Director of EPS Electric Power Systems GmbH, Claus Hofer, Deputy Head of IT at HABAU GROUP, in a group photo.

Investment in the digital future: HABAU relies on data centre from EPS Electric Power Systems

The HABAU GROUP has invested in the modernization of its IT infrastructure – with a high-availability data center, planned and implemented by EPS Electric Power Systems. The owner-managed family business with around 6,500 employees has been operating internationally for more than a century and is now one of the leading players in the Austrian construction industry. Whether it’s building construction, civil engineering, tunnel construction or pipeline construction, the HABAU GROUP is broadly positioned – and therefore also needs an IT infrastructure that can keep pace with this complexity.

> Reference
Login

|

Show content for your country?

Select a different country to see content for your location:

Login

|

Show content for your country?

Select a different country to see content for your location:

🍪 Accept cookies?

Cookies make it possible to control campaigns and optimize the website. By clicking “Accept”, you agree to the use of all cookies and enter the website. Read more in the privacy policy.

Forgot Password
Forgot Password